Published date: 2 March 2018
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work - 45000000
Location of contract
North West
Value of contract
£599,206
Procurement reference
CUM001-DN301551-96431514
Published date
2 March 2018
Closing date
12 January 2018
Contract start date
2 April 2018
Contract end date
6 December 2018
Contract type
Works
Procedure type
Other
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
This work package is for the 2 Stage Design and Build Works to effect the permanent repair of Middleton Hall Bridge. Stage One - Design will be a NEC3 ECC Option C Target Cost Contract. Stage Two - Build will be an NEC3 ECC Option A Fixed Price Contract. Following the 2015 floods the bridge was closed due to collapse at the downstream portal, a temporary bridge with localised resurfacing had been installed to reopen the road to traffic. Owing to further deterioration through 2016 temporary stabilisation of the damaged areas was carried out in October and November 2016. As part of these works a 4m3 fibre reinforced mass concrete block and drainage gully where installed to stabilise the downstream (north west) abutment and grout bags where installed under the north and south abutments to underpin the undermined sections. Following the temporary protection measures a scheme is required to replace the existing structure, this will require completion of the replacement design in time for in river construction works to be completed between 16th June 2018 and 31st September 2018. The replacement structure should be designed to carry an assessed load of C&U 40/44t. The existing structure is to be demolished and any materials to be used in the new structure should be stored for re-use. The contractor is to undertake the design of a single span structure to conform with DMRB design standards with a 120 year design life. Following completion of the design the contractor should obtain all necessary technical approvals, permits and agreements to undertake the installation of the new structure. The successful Contractor will assume the role and responsibility of Principal Designer & Principal Contractor as defined under CDM 2015 and mature technical appraisals to detailed design for approval by CCC before execution & delivery. Awarded via the Capital Schemes Framework
Award information
Awarded date
2 March 2018
Contract start date
2 April 2018
Contract end date
6 December 2018
Total value of contract
£599,206.53
This contract was awarded to 1 supplier.
Thomas Armstrong
Address
Workington Road, Flimby, Workkington, Cumbria, CA15 8RY
Reference
None
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Callum Lofthouse
Address
Cumbria House
107 - 117 Botchergate
Carlisle
CA1 1RZ
United Kingdom
Telephone
+44 1228221715
Callum.Lofthouse2@cumbria.gov.uk
Website
Share this notice
Closing: 12 January 2018