Published date: 22 March 2022

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 9 December 2021, 12pm

Contract summary

Industry

  • Electricity, heating, solar and nuclear energy - 09300000

  • Generators - 31120000

  • Battery packs - 31422000

    • Heat pumps - 42511110

    • Energy and related services - 71314000

Location of contract

North West

Value of contract

£583,000

Procurement reference

3147/533/JN/NW/21

Published date

22 March 2022

Closing date

9 December 2021

Closing time

12pm

Contract start date

20 January 2022

Contract end date

21 January 2022

Contract type

Supply contract

Procedure type

Open procedure (above threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements above the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

Yes


Description

The AMRC North West are currently developing a project to demonstrate the capability of the Industrial Internet of Things (IIoT) and smart technology usage cases to reduce the carbon footprint of a manufacturing site. The project will raise awareness of the latest technology and will be retrofittable to legacy manufacturing facilities. The technology will be able to provide a tangible benefit to the carbon footprint of a manufacturing site through data capture and visualisation and / or machine cognition.

The project will demonstrate how IIoT can be used in a manufacturing environment to understand, influence, and change the key levers in carbon reduction. A range of technologies will be implemented to understand energy usage, occupancy and asset parameters, environmental conditions, utilisation of micro grid technology and visualisation through a user-friendly dashboard. We are aiming to minimise or remove the requirement for fossil fuel dependency in the manufacturing environment. The facility is a demonstrator, and we would therefore like to show the various ways this can be retrofitted to a legacy manufacturing environment.

This tender is seeking to attract bids to supply, install and maintain multiple sources of renewable energy generation. These sources are divided into 4 lots of interest as stated below:

Lot 1 PV Solar
Lot 2 Static Battery Technology
Lot 3 Heat Pump
Lot 4 Innovative solution (this is an alternative renewable technology not covered by lots 1 to 3)

This is a FTS open exercise. The ITT can be downloaded by registering and expressing your interest on the University`s e-tendering system https://in-tendhost.co.uk/sheffield

If you have any questions or comments in relation to this tender they must be submitted via the In-tend system, this can be accessed at https://in-tendhost.co.uk/sheffield

Completed tenders must be returned through the same e-tendering system.


More information

Previous notice about this procurement

3147/533/JN/NW/21 - The Supply, Installation and Maintenance of Renewable Energy Generation (4 Lots)

  • Opportunity
  • Published 8 November 2021

Links


Award information

Awarded date

14 March 2022

Contract start date

16 March 2022

Contract end date

24 June 2022

Total value of contract

£409,403

This contract was awarded to 1 supplier.

Connected Energy Limited

Address

The Core, Science Central
Bath Lane
Newcastle upon Tyne
NE4 5TF

Reference

Companies House number: 07289730

Supplier is SME?

Yes

Supplier is VCSE?

No

Additional details

Award of Lot 2 - Static Battery Technology


About the buyer

Contact name

James Noble

Address

Western Bank
SHEFFIELD
S102TN
England

Email

james.noble@sheffield.ac.uk