Published date: 22 March 2022
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Electricity, heating, solar and nuclear energy - 09300000
Generators - 31120000
Battery packs - 31422000
Heat pumps - 42511110
Energy and related services - 71314000
Location of contract
North West
Value of contract
£583,000
Procurement reference
3147/533/JN/NW/21
Published date
22 March 2022
Closing date
9 December 2021
Closing time
12pm
Contract start date
20 January 2022
Contract end date
21 January 2022
Contract type
Supply contract
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
The AMRC North West are currently developing a project to demonstrate the capability of the Industrial Internet of Things (IIoT) and smart technology usage cases to reduce the carbon footprint of a manufacturing site. The project will raise awareness of the latest technology and will be retrofittable to legacy manufacturing facilities. The technology will be able to provide a tangible benefit to the carbon footprint of a manufacturing site through data capture and visualisation and / or machine cognition.
The project will demonstrate how IIoT can be used in a manufacturing environment to understand, influence, and change the key levers in carbon reduction. A range of technologies will be implemented to understand energy usage, occupancy and asset parameters, environmental conditions, utilisation of micro grid technology and visualisation through a user-friendly dashboard. We are aiming to minimise or remove the requirement for fossil fuel dependency in the manufacturing environment. The facility is a demonstrator, and we would therefore like to show the various ways this can be retrofitted to a legacy manufacturing environment.
This tender is seeking to attract bids to supply, install and maintain multiple sources of renewable energy generation. These sources are divided into 4 lots of interest as stated below:
Lot 1 PV Solar
Lot 2 Static Battery Technology
Lot 3 Heat Pump
Lot 4 Innovative solution (this is an alternative renewable technology not covered by lots 1 to 3)
This is a FTS open exercise. The ITT can be downloaded by registering and expressing your interest on the University`s e-tendering system https://in-tendhost.co.uk/sheffield
If you have any questions or comments in relation to this tender they must be submitted via the In-tend system, this can be accessed at https://in-tendhost.co.uk/sheffield
Completed tenders must be returned through the same e-tendering system.
More information
Previous notice about this procurement
3147/533/JN/NW/21 - The Supply, Installation and Maintenance of Renewable Energy Generation (4 Lots)
- Opportunity
- Published 8 November 2021
Links
-
- https://in-tendhost.co.uk/sheffield
- Tender notice
- All documents can be accessed at:
Award information
Awarded date
14 March 2022
Contract start date
16 March 2022
Contract end date
24 June 2022
Total value of contract
£409,403
This contract was awarded to 1 supplier.
Connected Energy Limited
Address
The Core, Science Central
Bath Lane
Newcastle upon Tyne
NE4 5TFReference
Companies House number: 07289730
Supplier is SME?
Yes
Supplier is VCSE?
No
Additional details
-
Award of Lot 2 - Static Battery Technology
About the buyer
Contact name
James Noble
Address
Western Bank
SHEFFIELD
S102TN
England
Share this notice
Closing: 9 December 2021, 12pm