Published date: 24 January 2019

This notice was replaced on 28 June 2021

This notice does not contain the most up-to-date information about this procurement. The most recent notice is:

Awarded contract (published 28 June 2021)

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Contract summary

Industry

  • Timber products - 03419100

Location of contract

London

Value of contract

£51,000 to £100,000

Procurement reference

C4N42875040

Published date

24 January 2019

Closing date

1 February 2019

Contract start date

1 April 2019

Contract end date

17 May 2019

Contract type

Supply contract

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Private procurement rules

Supply chain notices are business-to-business transactions and are not bound by the same rules and restrictions as public sector contracts. The UK government is not responsible for the conduct of such procurement.


Description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
a. tunnels:
i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
b. Worksites:
i. five main tunnel Worksites (drive and/or reception sites)
ii. 16 CSO Worksites
iii. two System modification Worksites Thames Tideway Tunnel
iv. works at Beckton Sewage Treatment works.

The Main Works West - Contract 405: all works from and including
the Acton Storm Tanks shaft to and including the Carnwath Road
Riverside shaft, as well as the Frogmore connection tunnel from
Carnwath Road Riverside shaft to King George's Park shaft.

This works package is for the provision of the design, supply and supervision of the slipform equipment for the secondary lining of the King Georges Park Shaft supply and delivery to site of Timber packers TTT West,

The Subcontractor will be required to provide the following deliverables to fulfil the requirements of this Subcontract:
• Provide the designs and calculations for the formwork (slipform) scheme for the King Georges Park shaft (to be checked by the Contractor)
• RAMS documents
• Supervisor for the duration of the work
• Driver of the slipform equipment for the duration of the work
• All equipment required
• Product specification data sheet
• Delivery of the above to site
• Trial slide at the Contractor's yard at West Drayton

The works are programmed for April 2019




Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)


More information

Links


About the buyer

Contact name

Bryan Jenkinson

Address

130 Wilton Road
London
SW1V1LQ
UK

Telephone

07590353416

Email

bryan.jenkinson@balfourbeatty.com