Published date: 30 January 2024

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 7 February 2024, 5pm

Contract summary

Industry

  • Assembly of metal structures - 45223100

  • Installation of metal structures - 45223110

  • Structural steelworks - 45223210

    • Structural steel erection work - 45262400

    • Structural steel erection work for buildings - 45262410

    • Structural steel erection work for structures - 45262420

    • Metalworking - 45262670

Location of contract

London

Value of contract

£1,000,000 to £2,500,000

Procurement reference

C4N77510209

Published date

30 January 2024

Closing date

7 February 2024

Closing time

5pm

Contract start date

21 April 2025

Contract end date

28 November 2025

Contract type

Works

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelworks



Scope of work

WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork Envelope consists of the design for construction and manufacture, supply, installation, and assurance of structural steelworks to the accommodation blocks, Lift & Escalator Electrical Room (LEER) on HS2 platform level, central core on concourse level, 'T' shaped lower-level escalator supports on HS2 platform, and 'V' shaped intermediate level escalator supports. The scope of works comprises the following:



Levels: HS2 Station Platform Level & Concourse Level

Elements: Structural steel

Design Development: Prepare the design for construction and manufacture, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements, ancillary elements, and products to meet the prescribed performance requirements.

Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards.

Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for construction in accordance with the approved design.

Assurance and Certification: Generate and supply comprehensive assurance documentation.

Coordination: Ensure coordination with various substrates, and other finishes to achieve integration within the overall project


More information

Links

Additional text

No Documentation is included at this point.


About the buyer

Contact name

Manish Tailor

Address

Astral House Imperial Way
Watford
WD244WW
UK

Telephone

07738982498

Email

supplychain@bbvsjv.com