Published date: 12 June 2019

Last edited date: 12 June 2019

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 28 June 2019

Contract summary

Industry

  • Road-maintenance materials - 44113900

  • Highway maintenance work - 45233139

  • Road-maintenance works - 45233141

    • Verge maintenance work - 45233229

Location of contract

RG1 2LU

Value of contract

£0

Procurement reference

RBC 00000620

Published date

12 June 2019

Closing date

28 June 2019

Contract start date

1 August 2019

Contract end date

6 September 2019

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

The Contractor will be required to undertake the following main elements of work: -

i. Traffic management - to design, set up and implement traffic management systems in accordance with Chapter 8 of the traffic signs manual to include diversions around the works within and outside the Council's administrative area.

ii. Removal and Disposal - The removal of the existing road surface to varying depths and disposal. This will include the safe disposal of any Tar Bound material found within the works. Some deeper removal of defective base course will be required.

iii. Existing Utility and drainage covers - All covers are to be raised or lowered to the correct levels any defective or broken cover is to be replaced prior to resurfacing.

iv. Surfacing - Resurfacing with Rolled Asphalt surface course 55% 0/10 with a minimum PSV of 55 and 68 in areas. Some areas of base course will need to be replaced.

v. Road Markings - The existing road markings are to be surveyed and recorded before any works are carried out and then repainted before any closure or diversion is removed.

vi. Existing drainage - All existing gulley's are to be cleaned out and the connections are to be jetted to ensure they are in proper working order.


More information

Links

Additional text

Is a Recurrent Procurement Type? : No


About the buyer

Contact name

Damola Aladesiun

Address

Bridge Street
Reading
Berkshire
RG1 2LU
United Kingdom

Telephone

0118 93 72945

Email

Damola.aladesiun@reading.gov.uk