Contract summary

Industry

  • Water pumps - 42122130

  • Earthmoving work - 45112500

  • Reinforced-concrete structures - 45223500

    • Footpath construction work - 45233161

    • Canal construction - 45247110

Location of contract

S43 3TN

Value of contract

£2,900,000

Procurement reference

TF-ITT-018

Published date

18 October 2024

Approach to market date

28 October 2024

Contract start date

3 March 2025

Contract end date

5 December 2025

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

This Main Works package will restore around 350m of canal and associated works.

In summary this will include the construction of canal channel, a lock, vehicle access bridge, the creation of Public Rights of Way (PROW) and the installation of a water supply pumping system.

An overview of the works is listed below:

Groundworks
• Strip existing topsoil and stockpile
• Installation of necessary temporary access roads and hardstanding areas to facilitate the proposed construction methodology
• Implement agreed temporary protection measures to utilities
• Excavation to formation levels
• Testing of excavated materials as required by the remediation strategy
• Stockpiling on site of suitable excavated material
• Disposal off site of any materials deemed unsuitable
• Installation of drainage
• Placing excavated and imported materials to final profiles, including topsoil
• Any other temporary works required to facilitate the proposed construction methodology, including the design of all such temporary works

Canal
• Construction of 350m of canal channel, including soft and hard edging
• Install pumping system for water supply
• Canal overflow

Bellhouse Lane Bridge
• Construction of new vehicular access bridge
• Excavation to formation and construction of bridge foundations
• Fabrication, delivery, assembly and installation of precast culvert
• Formation of earth approach ramps
• Road surfacing, vehicle restraint system and drainage to bridge
• Surfacing and drainage to footpath approaches

Lock
• Construct new lock structure, including in-situ concrete, coping stones and brick facing
• Manage installation of lock gates (via nominated supplier)

Rights of Way
• Constructing and / or maintaining temporary rights of way, including farm access
• Construction, realignment or upgrade of 2.2km of footpaths
• Removal of temporary footpaths and associated reinstatement
• Installation only of new fingerboard signage for pedestrian routes

Soft and Hard Landscaping

Clay Relocation
• Movement and placement of clay
• Reworking of clay as per Earth Works Spec Report for clay liner

CDM
• Fulfilment of the Principal Contractor role as defined under CDM Regulations 2015

Site Visits
A site familiarisation visit will be held WC 4 November 2024. Mid tender site visits will be held WC 25 November 2024.


More information

Spend profile

This table displays the spend profile of the notice
Financial year Budget
2025/2026 £2,900,000

About the buyer

Contact name

Jon Lindley

Address

6 The Stables, Staveley Hall, Staveley Hall Drive
Staveley
CHESTERFIELD
S43 3TN
England

Telephone

07891624755

Email