Published date: 24 July 2023

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 2 August 2023, 12pm

Contract summary

Industry

  • Excavating and earthmoving work - 45112000

  • Excavating work - 45112400

  • Basement excavation work - 45112420

    • Reinforced-concrete structures - 45223500

    • Drainage works - 45232452

    • Reinforced-concrete work - 45262310

    • Unreinforced-concrete work - 45262350

Location of contract

Any region

Value of contract

£70,000,000 to £100,000,000

Procurement reference

C4N72543960

Published date

24 July 2023

Closing date

2 August 2023

Closing time

12pm

Contract start date

27 May 2024

Contract end date

30 November 2025

Contract type

Works

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Mace Dragados are seeking expressions of interest from the supply chain to deliver the bulk excavation, muck away, substructure and superstructure works for the HS2 Curzon Station project. The forecasted value for the package is approximately £80m over a period of approximately 2-3 years.

The scope of the works shall consist of but not limited to the following elements of subcontract works:
Bulk excavation and disposal
Pile mat installation, compaction, Geogrid, maintenance and disposal
Haul Road installation, maintenance and disposal
Crane mat compaction, Geogrid, maintenance and disposal
All required double handling, filling from selected excavated material
Pile head preparation and pile cropping to level (disposal of material)
All Pile caps, foundations, bases, capping and ground beams
Ground bearing slab (inc drainage layer, waterproofing)
Retaining and liner walls
Attenuation Tank
Dewatering Refer (could be a separate package)
Temporary propping
Surface and foul drainage
Frame - Insitu RC Columns/piers, Column casings, Concrete walls, Core walls, RC beams,
PCC Hollow core planks, Twin wall (NEW)
Viaduct - Insitu RC Diaphragms, slabs, beams, walls, corbels, parapet walls
PCC - Viaduct beams (U12's) precast slabs (to service gallery)
Post tensioned concrete, box girders, bridge deck transverse slab
Waterproofing layer
Temporary works
Cranes
Support formwork
Frame platforms - RC slabs, RC topping to PCC slabs,
PCC Platforms - Planks, platform units, corbels, joints
Upper floors - Insitu RC to metal decks, Suspended Insitu concrete to PCC planks, upstands
Stairs & Ramps - Mass concrete stairs, PCC stair flights, landings, half landings,


More information

Links


About the buyer

Contact name

Paul Crouch

Address

Euston House, 24 Eversholt Street
London
NW11BS
UK

Telephone

07810710891

Email

paul.crouch@macegroup.com