Published date: 19 June 2020

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 18 April 2019

Contract summary

Industry

  • Architectural, engineering and surveying services - 71250000

  • Architectural and building-surveying services - 71251000

  • Building surveying services - 71315300

Location of contract

London

Value of contract

£12,750

Procurement reference

MT219980

Published date

19 June 2020

Closing date

18 April 2019

Contract start date

18 April 2019

Contract end date

31 May 2019

Contract type

Service contract

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The Science Museum building in South Kensington has expanded over a number of years and with each expansion differing methods of roof construction have been utilised. Following a recent redevelopment of levels 4 and 5 of the museum and water ingress issues that were encountered when building from, or connecting to the existing roof structures, the estate department would like to get a better understanding of the current condition and expected lifespan of the existing structures and coverings.
A lump-sum quotation is requested to carry out a full Condition Survey of the roofing elements of the Science Museum London that adheres to the SMG Condition Survey Suite of Documents. Focus is to be on the following objectives:
- A detailed report on the composition of the various roofing structures, their condition to determine the current state and expected remaining life.
- It will provide remedial repair suggestions prioritising and outline immediate repairs to develop understanding of any urgent works that could pose a threat to persons or collections inside and within close proximity to the building.
- The document will detail the locations and current state of rain water drainage outlets/collection points at the point where they interface with the roofing structure.
- It will identify areas of the roof that are currently inaccessible and make recommendations for the installation of safe access systems that will allow for PPM and repair tasks to be carried out safely.
- CAD plans will be developed from the Condition Survey which follows the Guidance Document for CAD Standard (SMG 0004/1:2018). They are to update the existing plans of the roof, detailing where roof structures change and the location of rainwater outlets to aid estate department PPM duties.
- A written summary of condition based on SMG 0005/1:2018 - Written Report Template
Inclusions - The appointed lead consultant's sub-surveyors will include the following:
- Concrete specialist
- Metallurgist
- QS
- Structural Engineer
Exclusions - The following is not required as part of this work:
- RIBA Stages 3-6.
- No remedial repair works will be undertaken as part of the survey.


More information

Links


Award information

Awarded date

17 June 2019

Contract start date

18 April 2019

Contract end date

31 May 2019

Total value of contract

£12,750

This contract was awarded to 1 supplier.

The Concrete And Corrosion Consultancy Practice

Address

Broadlands Business Park, , Canterbury

Reference

None

Supplier is SME?

No

Supplier is VCSE?

No


About the buyer

Contact name

Mr Andrew Lea

Address

Science Museum
Exhibition Road
London
SW7 2DD
England

Telephone

+44 2079424000

Email

andrew.lea@sciencemuseum.ac.uk

Website

http://www.sciencemuseum.org.uk