Published date: 14 June 2021
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Storm-water piping construction work - 45232130
Drainage construction works - 45232450
Drainage and surface works - 45232451
Drainage works - 45232452
Construction work for highways, roads - 45233100
Road construction works - 45233120
Road junction construction work - 45233125
Roundabout construction work - 45233128
Construction work for highways - 45233130
Highway maintenance work - 45233139
Roadworks - 45233140
Road-maintenance works - 45233141
Road-repair works - 45233142
Traffic-calming works - 45233150
Paths and other metalled surfaces - 45233160
Footpath construction work - 45233161
Cycle path construction work - 45233162
Surface work for highways - 45233210
Surface work for roads - 45233220
Road-surface painting work - 45233221
Paving and asphalting works - 45233222
Carriageway resurfacing works - 45233223
Surface work for streets - 45233252
Surface work for footpaths - 45233253
Pedestrian ways construction work - 45233260
Installation of road signs - 45233290
Installation of bollards - 45233291
Installation of road signals - 45233294
Foundation work for highways, roads, streets and footpaths - 45233300
Foundation work for highways - 45233310
Foundation work for roads - 45233320
Foundation work for streets - 45233330
Foundation work for footpaths - 45233340
Location of contract
South East
Value of contract
£220,010.59
Procurement reference
ET16237
Published date
14 June 2021
Closing date
12 February 2020
Closing time
2pm
Contract start date
22 March 2021
Contract end date
11 June 2021
Contract type
Works
Procedure type
Call-off from a framework agreement
A mini-competition or direct purchase from a pre-established framework agreement.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
A call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Awarded April 2020).
Improvements to the existing C114 High Street / Woolmer Way traffic signal junction in Bordon, including upgrading of existing pedestrian crossings to toucan crossings, with a new crossing to the northern arm of the signalised junction. Works include:
• Widening of selected paths to 3m wide minimum, including link to Lyndford Road
• Removal of C114 southbound left turn to create a cycle path and Landscaped verge.
• Remodelling of traffic islands, and crossings points
• Landscaping
• Drainage to suit proposed layout.
• Associated signs and road markings.
• Ducting and Chamber for streetlights and Traffic Signals, as well as ITS pole installation and removal.
• All TM for the works.
Award information
Awarded date
22 February 2021
Contract start date
1 March 2021
Contract end date
11 June 2021
Total value of contract
£220,010.59
This contract was awarded to 1 supplier.
Rocon Contractors Limited
Address
Vyne Lodge Farm
Vyne Road
Bramley
Hampshire
RG26 5DXReference
Companies House number: 00732319
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Contact name
Procurement Support
Address
The Castle
WINCHESTER
SO238UD
England
Share this notice
Closing: 12 February 2020, 2pm