Published date: 26 March 2020

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 28 February 2020

Contract summary

Industry

  • Urban environmental development planning - 90712100

Location of contract

East of England

Value of contract

£0

Procurement reference

SCDC001-DN460968-61451794

Published date

26 March 2020

Closing date

28 February 2020

Contract start date

4 May 2020

Contract end date

31 March 2024

Contract type

Service contract

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Cambridge City Council and South Cambridgeshire District Council (the Councils) are producing a joint Greater Cambridge Local Plan which will cover the combined area of these local authorities. The Councils are seeking suitably qualified consultants to carry out an Integrated Water Management Study to provide a robust evidence base for the development of the Greater Cambridge (GC) Local Plan. This will consist of an:
• Outline and detailed Water Cycle Study (WCS); and
• Level 1 Strategic Flood Risk Assessment (SFRA).

The aim is that this is an integrated study, given the overlaps between all aspects of the water environment and the same stakeholders being involved with both studies. The flooding evidence gathered from the SFRA should be fed into the WCS, and similarly relevant evidence collected for the WCS used for the SFRA.
The aim of the Water Cycle Study (WCS) is to look at all aspects of the water environment and ensure that water infrastructure can be managed sustainably alongside the level of growth being identified as the Local Plan is developed. It is expected that consultants will look at:
• water resources and supply systems, including non-potable water re-use;
• water quality and Water Framework Directive status;
• wastewater and treatment provision and capacity;
• surface water drainage and treatment;
• flood risk management / mitigation (with obvious links to the SFRA)
• opportunities to integrate the various aspects of water management


More information

Previous notice about this procurement

South Cambridgeshire District Council - Water Cycle Study and Strategic Flood Risk Assessment for Greater Cambridge

  • Opportunity
  • Published 29 January 2020


Award information

Awarded date

26 March 2020

Contract start date

4 May 2020

Contract end date

31 March 2024

Total value of contract

£74,993

This contract was awarded to 1 supplier.

Stantec UK (formerly Peter Brett Associates)

Address

RG1 4DN

Reference

None

Supplier is SME?

No

Supplier is VCSE?

No


About the buyer

Contact name

Nancy Kimberley

Address

South Cambridgeshire Hall
Cambourne Business Park
Cambourne
CB23 6EA
England

Email

Nancy.Kimberley@greatercambridgeplanning.org

Website

https://procontract.due-north.com/Advert?advertId=596636f3-7742-ea11-80ff-005056b64545