Published date: 14 July 2025

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.


Closing: 31 July 2025, 12pm

Contract summary

Industry

  • Construction work - 45000000

  • Works for complete or part construction and civil engineering work - 45200000

Location of contract

Yorkshire and the Humber

Value of contract

£26,000

Procurement reference

MT234986

Published date

14 July 2025

Closing date

31 July 2025

Closing time

12pm

Contract start date

1 September 2025

Contract end date

31 October 2025

Contract type

Works

Procedure type

Open procedure (below threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

Path surfacing and drainage
We are looking for an experienced contractor to carry out path works on the North York Moors near to Blakey Ridge.
The work is sensitive as it is over land that carries national and international conservation/habitat status being SSSI, SPA and SAC.
This project involves the construction of a 1030m recreational path to improve public access over the moorland area. The path will be constructed using suitable materials (sandstone aggregates) and aims to enhance visitors' experience while protecting sensitive habitats.
The awarding of the contract will be subject to weighting in consideration of price, proven experience of path construction in designated landscapes and also location (we are looking for a contractor local to the North York Moors and with knowledge of the area.
Path is 1030m and runs from Blakey Ridge Road at NZ 6752 0126 to near Fat Betty (monument) at NZ 6822 0196.
Presently the path is poorly drained in places, eroded and unsurfaced. Our aim is to prepare the path as required and to apply an aggregate sandstone surface at approx. 1.5m wide at a suitable depth to create a level path. It is envisaged that the construction of the path will be with a subbase of larger aggregate and a finer top surface. The path is to be laid and properly compacted with a camber to facilitate the shedding of water off the path.
Several locations will require drainage in the form of piped culverts under the path (please price up for seven pipes) with associated ditching in order to channel water through the pipe.
Vegetation that might be within the footprint of the path or associated ditching is to be carefully removed and replaced in areas of erosion where the current path is eroded wider that the designated 1.5m. It is very important that this 'landscaping' is carried out with great care and consideration of the national and international habitat designations that apply.
In addition to the habitat designations of the area, the path runs through some area of archaeological interest and consideration of these is also very important. An archaeologist may need to be present on site for a 'watching brief' when working near the areas of archaeological interest.
It is envisaged that works will start after July (after bird nesting season) and prior to November - September likely ideal time.
A site visit can be arranged in order to talk over the proposed works and look at finer details of the specification.


More information

Links


How to apply

Follow the instructions given in the description or the more information section.


About the buyer

Contact name

Bernie McLinden

Address

The Old Vicarage
Bondgate
Helmsley
YO62 5BP
England

Telephone

+44 1439772700

Email

bernie.mclinden@northyorkmoors.org.uk

Website

https://www.northyorkmoors.org.uk