Contract summary
Industry
Project and design preparation, estimation of costs - 71242000
Calculation of costs, monitoring of costs - 71244000
Location of contract
South East
Value of contract
£10,000 to £25,000
Procurement reference
BIP263759797
Published date
16 June 2017
Closing date
30 June 2017
Contract start date
4 September 2017
Contract end date
14 January 2019
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
NOTE: This notice was updated on 16 June 2017 for the following reason: Process changed to RestrictedThe Ramp buildings date back to the1940s and are temporary buildings. These buildings are well beyond their anticipated life span, and have been identified in the Trust 6 Facet Survey as Poor / requiring high cost investment and are energy inefficient. Due to the complexities of demolishing the entire Ramp, the Ramp has been designated in two sections: Upper and Lower Ramp. The Lower Ramp was demolished in 2011/12, and the space was used to create a staff car park.
Ashford and St Peter's NHS Foundation Trust (The Trust) now wishes to demolish the Upper Ramp and create space for the Trust future developments. The proposed works involves the careful demolition of Block 46, 50, 51, local Boiler Plant room and associated ramp corridor. It also includes services diversion for Bock 54, Asbestos removal, construction of car parks, provision of works compound and an access route for the new Urgent Care and Assessment Block, together with improvement of the road network.
Scope of the project
•Provision and maintenance of utilities to Block 54 until 2020/21;
•Diversion of all services currently routed through the Ramp;
•Demolition of Block 46, 50, 51, local Boiler Plant Room and associated ramp corridor as far as the fire doors in the corridor linking Level 2 DOK and PEW;
•Grading of the released land and formation of a new 90-spaces tarmacked visitor car park;
•Levelling the sloped green area in the main staff car park and creating a new design staff cark park with reallocated spaces;
•Closure of Hazel Car Park at the end of this project; this car park will be used as a contractor works compound for building the new UCAA Block;
•Additional external lighting.
Please refer to the attached project brief for more details.
The Trust wishes to procure a design team that will be constituted at the discretion of the Lead Designer in order to provide the following services for planning, design, demolition and building works delivery: Structural Engineer, Mechanical Engineer, Electrical Engineer, Transport Engineer / Car Parking Consultant.
Please send the expression of interest to the email address provided
mark.lukose@asph.nhs.uk
More information
Links
-
- https://www.delta-esourcing.com/delta/respondToList.html?noticeId=263759797
- Tender notice
- Please follow this link to view the notice.
Additional text
-
The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
About the buyer
Contact name
Mark Lukose
Address
St Peter's Hospital
Guildford Road
Chertsey , Surrey
KT16 0PZ
UK
Telephone
01784884766
Share this notice
Closing: 30 June 2017
All content is available under the