Published date: 20 November 2019
This notice was replaced on 13 January 2020
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Awarded contract (published 13 January 2020)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Building construction work - 45210000
Location of contract
TR11 2TF
Value of contract
£0
Procurement reference
10-183 Fish Factory
Published date
20 November 2019
Closing date
13 December 2019
Contract start date
20 December 2019
Contract end date
1 September 2020
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Keynvor MorLift Ltd seeks to appoint a suitable contractor to provide building works in support of a part ERDF funded project in Falmouth.
This tender is for the first of 4 buildings being renovated for office/work space. This will be required to meet building regulations and BREEAM standards.
The Fish Factory is a late 1930 built two storey steel frame building with roughcast rendered masonry structure and has a hipped roof of profiled asbestos cement. The majority of the ground floor area is raised approx. 900mm above finished wharf level, with a small loading bay area to the south elevation. The building has two existing staircases serving first floor level. Both exit to the south, one internal and one external. This building is currently used as KML HQ offices and storage at ground floor level and part cleared open space at the upper level - total floor area of approx. 915m2
The works will be phased to allow continued use of the ground floor space and then the first floor space once completed .The upper level is essentially one open plan space open to the roof void. There is a small core adjacent to the external stair with 2 toilets and a tea point in need of upgrade. The building itself is located on a busy working wharf which will require careful consideration in the planning of the works.
KML wishes to work with the appointed contractor on a collaborative design and build basis. During the initial stage, the contractor will work with KML and their architect to establish the design and specification for the building refurbishment. Once this is defined, the second stage of the project will be to undertake the building works.
The vision for the building is to upgrade/update all internal and external aspects whilst keeping original features/look/feel of the original building.
An Open Day for interested parties will be held on 3rd December 2019 at Falmouth Wharves, North Parade, Falmouth TR11 2TF.
More information
Additional text
-
Please apply directly to the buyer using the contact details provided. A Dropbox link will then be provided to access tender documents from 22nd November 2019.
There will be a requirement for references to be provided in advance of the tender submission.
About the buyer
Contact name
Craig Pullen
Address
Unit 15
Falmouth Wharves
Falmouth
TR11 2TF
England
Telephone
07531 975978
Share this notice
All content is available under the
