Published date: 20 July 2018

Closed future opportunity - This means that a potential contract has passed its approach to market date. A buyer can choose to consider any supplier interest or convert this notice into an opportunity ready for live procurement.


Approach to market date: 1 October 2018

Contract summary

Industry

  • Kerbstones - 44912400

Location of contract

South West

Value of contract

£2,500,000

Procurement reference

CORNWALL001-DN291006-80077119

Published date

20 July 2018

Approach to market date

1 October 2018

Contract start date

1 April 2019

Contract end date

31 March 2020

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

With the aim being to undertake work during the Spring of 2019, this preferred start date is intended to allow forall kerb fixings and corrosion remedial works to be completed ahead of separate resurfacing work planned for 2020/21. Following close monitoring of the existing 7200 Kerb Units ( 4 studs per kerb unit) and the associate Deck Waterproofing System over recent years, since their initial installation, as part of the strengthening and widening scheme around the turn of the century, and following the identification of serious deterioration, a number of technical solutions were developed and tested and the preferred solution going forward is described as follows with the main activities anticipated being:
Remove and retain existing kerb units for re-use; Remove existing mild steel holding down studs, clean and shot blast bridge deck to remove corrosion; Undertake Plate testing (MPI) and, if necessary, undertake Weld repairs; Weld new stainless steel holding down studs to the prepared bridge deck; Undertake Weld Test; Prime and waterproof the bridge deck with a high performance waterproofing system; Reinstate kerb units and fix down using new stainless steel fixings; Make good to all Drainage connections, with all of these aforementioned activities requiring strict associated Traffic Management control.
It is anticipated that the work may last for a duration of up to 12 months, from the proposed contract commencement date of 01/04/19.
Interested Contractors are invited to request a copy of the trial documentation for information, via the Portal, as this is likely to be of assistance in helping them to determine if they can offer the same or a similarly durable and cost effective solution and encourage a tendered submission in due course. However, no information taken or implied from this trial report and the supporting information documents shall necessarily be deemed acceptable for incorporation in the proposed works and the Council reserves the right to impose contractual terms and specifications that may not be satisfied by these means. It is anticipated the form of Contract will be NEC Option A, with an associated Activity Schedule. The Procurement process is expected to be an Open Invitation to Tender exercise and, within the duration of that process, prospective bidders will be invited to attend an appropriately scheduled Contractor Information Event, at the Bridge, to help familiarize themselves with local conditions, any potential operational constraints and ask any questions of the Bridge Engineering Manager and his Technical Support colleagues.


More information

Spend profile

This table displays the spend profile of the notice
Financial year Budget
2019/2020 £2,500,000

Additional text

This Prior Information Notice is intended to initially alert the market to this opportunity, ahead of the more formal open procurement process anticipated to be undertaken from the beginning of October, 2018, onwards. Any additional information requests or initial queries must ONLY be raised using the Due North Portal viasupplyingthesouthwest.org.uk , Project Reference DN291006.


About the buyer

Contact name

Mike Shillaber

Address

County Hall
Treyew Road
Truro
TR1 3AY
England

Telephone

+44 1872322716

Email

Mike.Shillaber@cornwall.gov.uk

Website

http://www.cornwall.gov.uk