Published date: 18 November 2020

Last edited date: 31 May 2022

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 1 December 2020, 6pm

Contract summary

Industry

  • Structural engineering consultancy services - 71312000

Location of contract

HU3 2TD

Value of contract

£5,000 to £10,000

Procurement reference

CLLD0026-Item14

Published date

18 November 2020

Closing date

1 December 2020

Closing time

6pm

Contract start date

14 December 2020

Contract end date

31 March 2022

Contract type

Works

Procedure type

Competitive quotation (below threshold)

The buyer selects a group of potential suppliers to invite to tender.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

Yes


Description

The St. Matthew's Enterprise Project is a Community Led Local Development project, funded in part from the European Regional Development Fund. CLLD activity is funded through European Structural and Investment Funds.

Giroscope Limited acquired the freehold of the former St Matthew's Church in 2018. Since then we have cleared the building, removed the pews and made emergency repairs where necessary. We have also reinstated the War Memorial window situated at the western end of the building, one of its key heritage features.

We are looking for Structural Engineer services for the refurbishment of the building once planning permission has been secured. The building is Grade 2 listed, with its broach tower and War Memorial window being its two key features of heritage interest.
The proposed works will involve installing mezzanine levels to both the southern and northern aisles of the former church. These mezzanines will have rooms constructed upon them with space for a gallery/walkway facing the nave. A small narthex will be constructed at the western entrance, situated underneath a walkway connecting the two mezzanines. This will double as a viewing area for the War Memorial window.

The roofs of each aisle will be replaced with an insulated warm roofs allowing for roof lights to be installed. Stair and lift access will also be installed to the mezzanines. Below the mezzanines a toilet and kitchen area will be constructed. We will remove the organ at the NE corner of the church allowing access from the mezzanine to the tower and chancel.

We will install a new heating system in the building incorporating underfloor heating to the nave. Other plumbing and electrical works will be carried out where necessary and appropriate. Other repairs and renewals will be made to the fabric of the building as part of this project.

Planning Reference: 20/00935/FULL | Change of use from church (Grade II Listed) to mixed use community facility, including cafe, business/workshop space, meeting and teaching rooms, event space, education zone, community market. External alterations including the installation of conservation style roof lights to north and south side aisle roofs, installation of on-roof solar photovoltaic panels to main south facing roof, the dropping of a window sill to ground level in the east elevation of the tower to create a fire escape door, and creation of external ramps. | Former St Matthews Church Boulevard Kingston Upon Hull HU3 2TA.

*Currently awaiting planning and Listed Building Consent decision due 20th November 2020.


More information

Additional text

please refer to our website for further information about this contract


About the buyer

Contact name

martin newman

Address

69 Coltman Street
Hull
HU32SJ
England

Telephone

01482576374

Email

CLLD@giroscope.org.uk

Website

www.giroscope.org.uk