Published date: 24 December 2021
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work - 45000000
Location of contract
North East, North West
Value of contract
£69,815,862
Procurement reference
tender_235792/1028918
Published date
24 December 2021
Closing date
8 March 2021
Closing time
12pm
Contract start date
29 November 2021
Contract end date
6 October 2027
Contract type
Works
Procedure type
Restricted procedure (above threshold)
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
National Highways continues to roll out the Asset Delivery model to its operational areas. There is a
requirement to deliver a range of renewal, improvement and selected small scheme construction works on the
Strategic Road Network in areas utilising specialist contractors working collaboratively with National Highways
to deliver these works. It is envisaged that this framework will straddle two Road Investment Strategy (RIS)
periods (RIS 2 and RIS 3) enabling a smooth transition between them. Works for schemes have been divided
into a number of workstreams that align with the contractors' specialisms, and will also include design.
Bandings have been introduced into the framework model to differentiate some contracting terms between
bands.
This award is for Lot 1.1 General Civil Engineering (super region) in the North region (National Highways Areas 10, 12, 13 and 14).
This Lot covers the supply of materials, plant and labour to carry out construction and removal activities, including but not limited to;
- Highway drainage assets
- Pipes,
- Ditches,
- Swales,
- Ponds,
- The control and disposal of contaminated material,
- The installation of traffic signs and posts,
- Non-illuminated traffic signs and posts
- Earthworks,
- Ducting,
- Kerbing,
- Footways,
- Modular paving,
- Site clearance,
- Brick, block and stonework,
- Piling,
- Temporary works required to ensure a safe method of working.
- Demolition
- Concrete,
- Asbestos removal (planned)
- Earthwork stabilisation,
- Counterfort drains,
- Soil nailing
- Ground anchors
- Slope netting (rock and soil),
- Rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and
- 'Innovative' stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil
Other duties
This scope also includes:
- Mobilisation
- Early Contractor Involvement
- Elements of Supplier Design
- Principal contractor
- Welfare facilities
- Manage Network Occupancy
- Community; and
- Contingency
The scope may also include carrying out some of the duties of the Maintenance & Response Contractor and providing Incident Response Rapid Response) when instructed.
More information
Attachments
Award information
Awarded date
29 November 2021
Contract start date
29 November 2021
Contract end date
6 October 2027
Total value of contract
£69,815,862
This contract was awarded to 1 supplier.
Galliford Try Construction Limited
Address
Cowley Business Park, Cowley, Uxbridge, Middlesex, UB8 2AL
Reference
No reference - other
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Contact name
National Highways
Address
The Cube, 199 Wharfside Street
Birmingham
B1 1RN
England
Share this notice
Closing: 8 March 2021, 12pm