Published date: 28 September 2023

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 4 July 2023, 12pm

Contract summary

Industry

  • Windows - 44221100

  • Window frames - 44221110

  • Energy-efficiency consultancy services - 71314300

Location of contract

CO4 3SQ

Value of contract

£60,000

Procurement reference

0c8226c2-854a-489f-9437-f55363c62e65

Published date

28 September 2023

Closing date

4 July 2023

Closing time

12pm

Contract start date

24 July 2023

Contract end date

23 July 2024

Contract type

Service contract

Procedure type

Not specified

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

In December 2020 the University declared a Climate and Ecological Emergency and in May 2021 the University set a target to reach net zero scope 1 and 2 carbon emissions by 2035 from a 2019 baseline of 12,300 tonnes, with a maximum of 3,000 tonnes of offsetting. The University has reduced its scope 1 and 2 carbon emissions from a peak of 18,851 in 2012 to a low of 8,997 tonnes in 2020 due to the COVID-19 pandemic. Emissions have risen back to 10,475 tonnes in 2021.

The Wivenhoe Campus was completed in the mid-1960s by Kenneth Capon of the Architects Co-Partnership (ACP). It is a purpose designed university campus designed around five interlinked squares set in a 200-acre parkland to the southeast of Colchester.

A key feature of the original architectural narrative of the Colchester campus is the metal framed single pane glass windows and the brutalist architecture. It consists of a reinforced concrete frame which has both precast and in-situ elements. The facades have exposed precast concrete columns and non-structural precast mullions.

A significant part of achieving net zero scope 1 and 2 carbon emissions involves building fabric improvements and a priority will be the original 1960's single pane glass windows across much of the Colchester campus.


More information

Links


Award information

Awarded date

28 September 2023

Contract start date

24 July 2023

Contract end date

23 July 2024

Total value of contract

£129,982.35

This contract was awarded to 1 supplier.

Purcell Architecture Ltd.

Address

St Mary's Hall, Rawstorn Road, Colchester, CO3 3JH, GB

Reference

None


About the buyer

Contact name

Aston Baker

Address

University of Essex, Wivenhoe Park
, ,
Colchester
CO4 3SQ
UNITED KINGDOM

Telephone

01206 872779

Email

ab17001@essex.ac.uk