Published date: 5 August 2016
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction work - 45000000
Location of contract
South West
Value of contract
£150,000
Procurement reference
BRISTOLCC001-DN166522-66443093
Published date
5 August 2016
Closing date
30 September 2016
Contract start date
12 December 2016
Contract end date
27 October 2017
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
TQEZ St Phillips Footbridge. This project has been designed by the Employer with elements to be designed by the selected Contractor as specified in the Works Information. The construction aspects are as outlined below:
Construction of a 4m wide footbridge over the River Avon Path and River Avon (New Cut) inclusive of upgrade works to the River Avon Path.
The footbridge will provide a cycle/pedestrian link between the River Avon Path and Arena. The proposed footbridge is a new steel box girder of varying cross section with a Y-shape arrangement (in plan) with one branch connected to an elevated concrete approach ramp and the other branch carrying the pedestrian staircase down to the upgraded at-grade pedestrian footpath (River Avon Path).
The upgraded section of the River Avon Path will be realigned adjacent to the elevated concrete approach ramp, supported on cast in-situ piled raft slab foundation, raised to 9.1m (footpath surface) with an upstand to a level of 9.5m and tie in with the River Avon Path / Victor Street at either end.
About the buyer
Contact name
Steve Gay
Address
City Hall
PO Box 3176
Bristol
BS3 9FS
UK
Telephone
+44 1173525176