Published date: 18 March 2025
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Repair and maintenance work in connection with sports facilities - 45212290
Surface work for roads - 45233220
Surface work for footpaths - 45233253
Location of contract
EN2 9HG
Value of contract
£0
Procurement reference
IT-442-76-LVRPA2024/24 - AWARD
Published date
18 March 2025
Closing date
4 February 2025
Closing time
12pm
Contract start date
23 March 2025
Contract end date
30 June 2031
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Queen Elizabeth Olympic Park was home to the 2012 London Olympic Games. The Lee Valley Regional Park Authority is now the proud owner of two of the venues based on the park: The Lee Valley VeloPark and The Lee Valley Hockey & Tennis Centre. LVRPA owns an area of land that currently has around 36,000m2 of resin bonded 'Gold Top' surfacing. Much of the resin bonded surface is now showing signs of deterioration and requires stripping up and replacing. The substrate is mainly concrete laid to falls and the areas generally drain into Acco drainage channels. There are some additional areas of resin bound surfaces, but these are fairly small in terms of square metreage. The resin bound areas are porous and generally drain through holes drilled through the substrate into the ground below.
This project is for the phased replacement of the Gold Top areas on a priority basis. It is envisaged that the Authority will split the 36,000m2 into approx. 4500m2/annum over an 8 phase period (one phase per financial year). The contractor will be required to remeasure areas on completion and works will be paid on a square metre basis.
The first phase of works will be scheduled to take place in March/April 2025 due to financial reasons but generally it is envisaged that the following phases will be carried out in May/June each year with the second phase being a 'follow on' to phase 1 in 2025.
The contractor should price for each phase separately and in doing so allow a nominal uplift for inflation and material price increases.
Award information
Awarded date
18 March 2025
Contract start date
23 March 2025
Contract end date
30 June 2031
Total value of contract
£0
This contract was awarded to 1 supplier.
Henderson & Taylor (Public Works) Limited
Address
Henderson Taylor, Tunrpike Lane, Chadwell St Mary, Essex, United Kingdom, RM18 8TJ
Reference
None
About the buyer
Contact name
Alex Thompson
Address
Bulls Cross
Enfield
Middlesex
EN2 9HG
United Kingdom
Telephone
01992 709888
Share this notice
Closing: 4 February 2025, 12pm