Published date: 2 October 2025
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Structural engineering consultancy services - 71312000
Location of contract
CW1 4TQ
Value of contract
£2,289,010.22
Procurement reference
CF-3210000D0O000000rwimUAA
Published date
2 October 2025
Closing date
13 June 2025
Closing time
12pm
Contract start date
24 July 2025
Contract end date
23 July 2032
Contract type
Service contract
Procedure type
Call-off from a framework agreement
A mini-competition or direct purchase from a pre-established framework agreement.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Leighton Hospital, built in the late 1960s and opened in 1972, is one of the most cost-effective acute hospitals and is a sister hospital to Airedale NHS Foundation Trust. Much of the original structure incorporates RAAC panels in its roof and walls, with over 16,500 roof panels and various internal and external wall panels, mostly non-load bearing. Extensive inspections and testing have been conducted, with a risk rating system (P1 to P4) applied to prioritise repairs. Ongoing remedial work includes the installation of steel frameworks, Unistrut supports, and timber reinforcements to address high-risk areas while maintaining hospital operations. RAAC management is overseen by the Estates team and supported by a detailed Structural Risk Appraisal and RAAC Management Plan.
Mid Cheshire Hospitals NHS Foundation Trust undertook a further competition for Reinforced Autoclaved Aerated Concrete (RAAC) structural engineering and survey inspection services under the NHS Shared Business Services Healthcare Planning, Construction Consultancy and Ancillary Services Framework (SBS10190), Lot 3 - Civil and Structural Engineering.
The services is required to deliver both structural engineering and surveying services, with data to be managed through a Common Data Environment provided by BIS Consult. This service will support a multi-year mitigation programme through to the hospital's planned replacement in 2032, after which the current buildings are expected to be demolished.
The contract duration will be seven (7) years, up to the anticipated demolition of the current buildings in 2032. Should demolition be delayed beyond this date, the Contracting Authority reserves the right to extend the contract accordingly, subject to mutual agreement and continued service requirements.
Award information
Awarded date
2 October 2025
Contract start date
24 July 2025
Contract end date
23 July 2032
Total value of contract
£2,289,010.22
This contract was awarded to 1 supplier.
Mott MacDonald Limited
Address
10 Fleet Place EC4M 7RB
Reference
None
Supplier is SME?
No
About the buyer
Contact name
Kiah Bouwer
Address
Middlewich Rd
Crewe
CW1 4TQ
GB
Share this notice