Published date: 9 September 2025

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.


Closing: 19 September 2025, 5pm

Contract summary

Industry

  • Construction work - 45000000

Location of contract

South East, South West

Value of contract

£300,000

Procurement reference

Muck Away M3J9

Published date

9 September 2025

Closing date

19 September 2025

Closing time

5pm

Contract start date

20 October 2025

Contract end date

20 October 2027

Contract type

Service contract

Procedure type

Competitive quotation (below threshold)

The buyer selects a group of potential suppliers to invite to tender.

This procedure can be used for procurements below the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North.

Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety.

The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions.

The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and
around the junction for both pedestrians and cyclists.

Other construction works include but not limited to
the following:
-2no. underpasses for the M3 mainline and A34 Northbound
-1no. pedestrian subway
-9no. MS4s, 1no. long span and 1no. portal gantries
-Footbridge over the River Itchen
-6no. locations for sheet piling locations and 1no. for blockwork retaining wall
-Site wide motorway communications installation
-Site wide vehicle restraint barrier installation

The scope of the works required is for the removal of arisings from the site including concrete, asphalt and inert materials.


How to apply

Follow the instructions given in the description or the more information section.


About the buyer

Address

5 Churchill Pl
London
E145HU
England

Email

A66ExpressionOfInterest@balfourbeatty.com