Published date: 19 April 2017

Last edited date: 19 April 2017

Awarded contract - This means that the contract has been awarded to a supplier.


Closing: 22 November 2016

Contract summary

Industry

  • Marine construction works - 45244000

Location of contract

North West

Value of contract

£0

Procurement reference

LPOOL001-DN216601-11698301

Published date

19 April 2017

Closing date

22 November 2016

Contract start date

1 January 2017

Contract end date

26 April 2017

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The successful contractor will be required to undertake the refurbishment of the steel spigots that are located within the four interconnected reinforced concrete pontoons that provide the dampening mechanism to the pontoons when there is a sea swell, tidal surge or wave movement to reduce the vertical and lateral movement enabling a more stable platform (berth) to carry out cruise operations at the Liverpool Cruise Liner Terminal. The maintenance inspections carried out identified that major repair /refurbishment works are required as the steel spigot hinges and the nuts and bolts that secure the spigot to the concrete face of the pontoons have fractured or come loose. Currently temporary measures have been put in place to maintain operations, but it is essential repairs are carried out before the 2017 Cruise season which starts in April 2017.


More information

Additional text

Further information on this opportunity can be found at https://procontract.due-north.com. It is feasible to submit bids for either Option 1 or 2, or both options.
Option 1 - For undertaking the works in a Dry Dock Environment or elsewhere based on a fully designed solution prepared by Royal Haskoning DHV for LCC. This design referred to as the "Reference Design" and included in the "Works Information" section of the Scope of Works.

Option 2 - For Tenderer's Alternative Design proposal for carrying out the works in-situ without removing the pontoons to a dry dock.


Award information

Awarded date

5 April 2017

Contract start date

6 April 2017

Contract end date

31 October 2017

Total value of contract

£1,236,318

This contract was awarded to 1 supplier.

John Sisk and Son (Holdings) Limited

Address

1 Curo Park, Frogmore,
St Albans,
Hertfordshire
AL2 2DD

Reference

None

Supplier is SME?

No

Supplier is VCSE?

No


About the buyer

Contact name

Daniel Cheetham

Address

4th Floor, Cunard Building
Liverpool
L3 1DS
UK

Telephone

+44 1512330592

Email

daniel.cheetham@liverpool.gov.uk

Website

http://www.liverpool.gov.uk