Published date: 14 November 2017

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 8 December 2017

Contract summary

Industry

  • Electricity, heating, solar and nuclear energy - 09300000

  • Architectural, construction, engineering and inspection services - 71000000

Location of contract

South West

Value of contract

£275,000

Procurement reference

TORR001-DN308259-92746685

Published date

14 November 2017

Closing date

8 December 2017

Contract start date

26 February 2018

Contract end date

30 March 2018

Contract type

Not specified

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The existing 12 (no.) 50 kW Concord mains gas boilers are nearing end of their useful life and require replacing. The overall aim is to provide a return on the Authority's investment, improve efficiency, remove end of life equipment and plant, improve controls, reduce duplication, reduce maintenance costs and requirements . The current 600 kW boiler capacity is subject to review by the contractor to ensure that the maximum demand from the facility can be met by any replacement system. The 600 kW is based on the current boiler sizes on site but may not represent an appropriate size and a smaller system is acceptable if it meets peak demand requirements. This should be clearly identified in any documents. The client is not predetermining the new heating system type or its supplier and this is entirely to the contractors' design subject to evidence that the proposal is adequate to meet the heat demand.


About the buyer

Contact name

Chris Wilson

Address

Riverbank House
Bideford
EX39 2QG
England

Telephone

+44 1237428730

Email

chris.wilson@torridge.gov.uk

Website

http://www.torridge.gov.uk/