Published date: 20 June 2024
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Roof repair and maintenance work - 45261900
Location of contract
West Midlands
Value of contract
£100,000 to £500,000
Procurement reference
BIP869642539
Published date
20 June 2024
Closing date
11 July 2024
Closing time
12pm
Contract start date
5 August 2024
Contract end date
11 October 2024
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The works consist of stripping of the existing built up felt roof down to the existing deck, and then laying of new cut to falls insulation and a Garland UK built up felt roof system as per the schedule of works and specification. The works package also includes the replacement of the existing rooflights, fascia, edge trims, hoppers and downpipes all as per the schedule of works and specification document. All works are to be undertaken by competent NFRC members and certified/approved contractor on the Garland UK authorised contractor network to ensure the Garland UK Warranty/guarantee is valid.
This project is aimed to be commenced during the summer holidays and then during the Autumn school term therefore the school will remain "live" at times and there will be children and building users within the building and adjacent playing areas etc. Given this there is a strict requirement to leave all areas and grounds habitable, safe and unimpeded, including protecting all high level windows, roof lights and fire escapes. The contractor will also be required to protect the children, buildings users and staff within the school at all times.
The works are to be phased as follows:
Section 1 (Work period 1)
- As highlighted within the prelims this section is to be commenced on 5th August 2024 and completion by 23rd August 2024. This section is for completion of all the required works to above the kitchen and classroom as shown on the Section / Work Period plan.
Section 2 (Work period 2)
- As highlighted within the prelims this section is to be commenced on 5th August 2024 and completion by 11th October 2024 (10 weeks). This section is for the remainder of the required works to the roofs.
You should provide a tender price for ALL the items presented in the attached "Schedule of works", drawings and the Garland Specification document. All reasonable undertakings and inclusions required to complete the works must be allowed for within the Tender price, whether or not specifically identified within the Tender Documentation or Specification. All work to conform to good practice and current British Standards and Regulations, including NFRC Safe to Torch.
More information
Links
-
- https://www.delta-esourcing.com/tenders/UK-GB-Shrewsbury:-RMCB-050---Reroofing-Phase-1---Shifnal-Primary-School/BE3ENW86F4
- Tender notice
- Please follow this link to view the notice.
Additional text
-
The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
About the buyer
Contact name
Procurement Team
Address
Shirehall
Abbey Foregate
Shrewsbury
SY2 6ND
UK
Telephone
+441743252992
Share this notice
Closing: 11 July 2024, 12pm