Published date: 25 September 2025
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Overhead cable carriers - 31682410
Cable conduits - 44322100
Cable ducts - 44322300
Location of contract
West Midlands, London, South East
Value of contract
£5,000,000 to £10,000,000
Procurement reference
C4N100286450
Published date
25 September 2025
Closing date
9 October 2025
Closing time
12pm
Contract start date
31 May 2026
Contract end date
7 July 2028
Contract type
Supply contract
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
P1 Brackets and Cable Management System - Costain HRS02 Tunnel and Lineside M&E
Scope/ What Will Be Required
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future.
Package 1 Brackets and Cable Management system scope associated to contract HRS02 consists of brackets and cable management systems for the route of the railway, the route being circa 180km in length, inclusive of;
-Tunnel Bracketry and associated fixings
-Cross Passage Bracketry and associated fixings
-Ladder Rack and Associated fixings
-Cable Tray and associated fixings
-Trunking and associated fixings
Costain require a supplier to design and supply only of the bracket and cable management system. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas.
-Health and Safety
-Programme - Installation and Commissioning activities
-Cost
-Quality and Assurance Efficiency
-Whole Life Cost
-Carbon Efficiency
All the innovation and design development must be accompanied with a rigorous approach that the technical requirements are met. Including testing where necessary. The scope of design and supply will include the following:
-Support to Costain's design partner through concept and detailed design
-Bracketry and Containment testing (Fatigue and Fire)
-Supply of bracketry and cable management system products and the associated fixings
-Provision of samples and mock ups
Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to able to carry out the intended scope of works prior to completing the expression of interest.
More information
Links
-
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=100286452
- Tender notice
- Please follow this link to view the notice.
About the buyer
Contact name
David Smith
Address
70 St. Mary Axe
London
EC3A8BE
UK
Telephone
+447921243727
Share this notice
Closing: 9 October 2025, 12pm
All content is available under the
