Published date: 13 August 2019
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Works for complete or part construction and civil engineering work - 45200000
Construction work for university buildings - 45214400
Location of contract
South West
Value of contract
£4,000,000
Procurement reference
tender_151781/790876
Published date
13 August 2019
Closing date
13 September 2019
Contract start date
6 January 2020
Contract end date
31 March 2022
Contract type
Works
Procedure type
Restricted procedure (above threshold)
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
The University of Bristol requires a Main Contractor to construct a new research facility (the National Soil Foundation-Structure Interaction (SoFSI) Facility) at its Langford campus. The new facility will:
- have Gross Internal Area of approximately 630 m2,
- have a steel frame superstructure, concrete block walls and timber cladding,
- have highly reinforced specialist substructure including pit walls and strong floor,
- house a 6 m x 4 m seismic testing table and 5 m x 6 m x 4 m deep test pit,
- house highly sensitive scientific equipment which requires high-precision substructure works.
The construction budget is approximately £4,000,000 to £5,000,000 GBP.
The University intends to appoint a main contractor in January 2020, with a start on site in February 2020 and defect free handover in early Spring 2021.
The University is following a single-stage tender to appoint the contractor, with this procurement following the restricted procedure.
The University is currently progressing detailed design and intends to issue invitations to tender following completion of RIBA stage 4 in late September 2019, to those suppliers shortlisted following this PQQ stage.
Procurement documents are available at https://tenders.bris.ac.uk
About the buyer
Address
1-9 Old Park Hill
Bristol
BS2 8BB
England
Website
Share this notice
Closing: 13 September 2019