Published date: 29 July 2016
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction structures and materials; auxiliary products to construction (except electric apparatus) - 44000000
Construction work - 45000000
Location of contract
SN12JH
Value of contract
£125,000
Procurement reference
SWINDON001-DN175231-02550697
Published date
29 July 2016
Closing date
1 September 2016
Contract start date
16 September 2016
Contract end date
25 November 2016
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Bridges Backlog Maintenance - Package 1 - 2016-17
Swindon Borough Council invites expressions of interest from suitably qualified and experienced service providers for the provision of the following work items:
Project Description
The works associated with Bridges Backlog Maintenance - Package 1 will include the following:-
i) Establishment and maintenance of site compound(s).
ii) Establishment and maintenance of subway closures and footbridge closures including pedestrian diversion signage.
iii) Establishment and maintenance of signal controlled lane closure.
iv) Temporary works appropriate to the works.
v) Vegetation clearance.
vi) Demolition of small bridge incorporating steel beams, transverse timber sleepers and concrete deck slab.
vii) Demolition of a small corrugated steel (Armco) culvert.
viii) Supply and install 2 x 1050mm diameter pipes in concrete surround.
ix) Construct brick headwalls with mass concrete backing.
x) TORC cleaning and/or grit blasting of wing walls and edge beams.
xi) Painting of concrete surfaces, e.g. subway walls and soffits.
xii) Preperation and painting of metal parapets.
xiii) Localised parapet repairs, e.g. welding and grouting.
xiv) Mastic sealant to joints.
xv) Excavation and reinstatement of bitmac footpaths, depth 90mm.
xvi) Overlay bitmac footpaths, depth 30mm.
xvii) Concrete repairs to edge beams and ballast walls.
xviii) Rebuilding of masonry parapet including reinforced concrete coping.
xix) Masonry repairs to small stone arch brick.
xx) Removal of a timber bridge deck and replacement with anti-slip GRP decking.
Contract Period
The contract will be initially for a period of 2 1/2 months commencing 16th September 2016.
The relevant tender documents are included within this project webpage as attachments.
Tender Responses are required to be submitted no later than 1st September 2016, 14.00GMT by hardcopy to Swindon Borough Council only (refer to the Invitation to Tender document)
If you require any clarifications on the tender documents please submit these in writing via e-mail, including the project name clearly in the e-mail title, to Tomasz Wysocki at hppd@swindon.gov.uk between 29th July to 19th August 2016, 12.00 GMT.
The Council's responses to these clarification questions will be uploaded as attachments on the project webpage attachments section. Therefore it is the Contractor's responsibility to check the site regularly for updates to clarifications, as you will not be advised when updates have been made.
In the event of difficulties downloading tender documents, please refer to the named contacts Tomasz Wysocki at hppd@swindon.gov.uk.
More information
Links
About the buyer
Contact name
Tomasz Wysocki
Address
Swindon Borough Council, Wat Tyler West, 4th Floor
Wat Tyler House, Beckhampton Street
Swindon
SN1 2JG
UK