Published date: 15 June 2023
Last edited date: 21 July 2023
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Ventilation installation work - 45331210
Inspection of ventilation system - 71315410
Ventilation consultancy services - 71321400
Construction-site supervision services - 71521000
Construction consultancy services - 71530000
Location of contract
GU24 0NF
Value of contract
£80,000 to £100,000
Procurement reference
Brooksby/SIL HVAC/2023
Published date
15 June 2023
Closing date
1 August 2023
Closing time
2pm
Contract start date
1 September 2023
Contract end date
31 August 2024
Contract type
Works
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design and construction of a safety system that detects overpressure and underpressure of various areas and rooms in the Brooksby facility. The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans. As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1. Safety Requirement System (SRS) attached at the back of this document for more detail.
Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511. A non-exhaustive list of typical deliverables for such a project is as follows:
• Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves)
• Bill of Materials (BoM) for all materials and accessories to be purchased
• Quotations for all required materials
• Functional logic diagrams (if required)
• I/O lists
• Functional Design Specifications (FDS)
• Loop diagrams
• Instrument wiring diagrams
• Electrical wiring diagrams
• Control panel layout and drawings
• Safety Integrity Level (SIL) Verification report
• SIL certifications for all relevant hardware (if available)
• Factory Acceptance Test (FAT) procedures
• Site Acceptance Test (SAT) procedures
• Safety Instrumented System (SIS) installation and commissioning plan
• SIS validation plan
• Safety manuals
• Proof test procedure
• Spare parts list
• Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS).
More information
Attachments
-
- Appendix A - Supplier Pre-Qualification Questionnaire.docx
- Bidding documents
-
- Appendix B - Pricing Schedule.xlsx
- Bidding documents
-
- Appendix C - Evaluation Scoring Matrix.pdf
- Evaluation criteria
-
- Appendix E - Specification documentation, drawings (combined).pdf
- Technical specifications
-
- Appendix F - Form of Offer.docx
- Bidding documents
-
- ECC4_OpA_63112_Contract_Data.docx
- Contract draft
Share this notice
Closing: 1 August 2023, 2pm