Published date: 14 February 2025

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 25 April 2025, 4pm

Contract summary

Industry

  • Communications control system - 32573000

  • Command, control, communication and computer systems - 35710000

  • Command, control, communication systems - 35711000

    • Tactical command, control and communication systems - 35712000

    • Command and control system - 42961000

    • Computer control system - 48151000

Location of contract

North West

Value of contract

£7,600,000

Procurement reference

CF-0213800D4L000000iAvzUAE

Published date

14 February 2025

Closing date

25 April 2025

Closing time

4pm

Contract start date

12 September 2025

Contract end date

12 September 2028

Contract type

Supply contract

Procedure type

Open procedure (above threshold)

Any interested supplier may submit a tender in response to an opportunity notice.

This procedure can be used for procurements above the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The Waste Packaging and Encapsulation Plant (WPEP) is a two-line process plant designed for encapsulating Flocculant (FLOC) arisings from the Enhanced Actinide Removal Plant (EARP) process, waste from the Segregated Effluent Treatment Plant (SETP) and the Effluent Plant Maintenance Facility (EPMF). The waste is encapsulated in stainless steel drums within a cement mix. Filled drums are lidded, and then monitored before being stored, initially in the WPEP Store, before being exported for longer term storage in the Encapsulated Product Stores.

The aim of the project is to replace the existing WPEP Distributed Control System (DCS) with a replacement control system based on modern technologies, whilst applying relevant Sellafield standards, guides and procedures.

The project aims to:

• Replace the existing DCS hardware, system software and configuration with a modern control system ensuring that the plant continues to function in the same manner
• Incorporate the currently independent Drum Decontamination and Powders PLC functionality to the replacement WPEP control system

The operability of the replacement control system is to align, as closely as possible, to the existing control system to reduce the impact on operator training and the changeover between the two systems.

• The replacement control system will be installed such that the existing control system remains in situ, providing a fall-back in the event of delays or commissioning issues. However, given space constraints, it may not be possible to do this in all instances and some existing equipment may be removed prior to installing elements of the replacement control system.

Please note the duration of the contract is an estimate which will be finalised upon Contract Award.

Parties who are interested in potentially submitting a tender for this opportunity are requested to register on the shared service Nuclear Decommissioning Authority (NDA) OneNDA eCommercial Systems powered by Atamis, which can be accessed via the URL https://atamis-2464.my.site.com/s/Welcome . Parties who register on this system should then register against Atamis Project C13138 in order to access the Waste Packaging & Encapsulation Plant Distributed Control System opportunity in order to:

- view the procurement and tender documents,
- ask questions or request further information using the inbuilt messaging facility; and
- submit your tender response


About the buyer

Contact name

Richard Dawson

Address

Hinton House, Birchwood Park Avenue
Warrington
WA3 6GR
United Kingdom

Email

richard.j.dawson@sellafieldsites.com