Published date: 10 March 2025
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction work - 45000000
Location of contract
TS104RF
Value of contract
£0 to £24,999
Procurement reference
IT-540-120-3519 - AWARD
Published date
10 March 2025
Closing date
13 February 2025
Closing time
12pm
Contract start date
3 March 2025
Contract end date
2 March 2026
Contract type
Supply contract
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
CPI, located at John Walker Road, Sedgefield, TS21 3FE, is currently facing operational challenges due to frequent brownouts at their Coxon building. These power inconsistencies have led to periodic shutdowns, which disrupt critical operations and pose risks to ongoing activities at the facility.
To mitigate these power issues, CPI is seeking proposals for the various work packages to result in installation of an Uninterruptible Power Supply (UPS) system along with a generator link for future installation. The primary objective is to ensure seamless power continuity, thereby preventing future brownouts and enabling uninterrupted operation during power fluctuations.
This project has been split into several RFQ's and suitably qualified vendors are invited to quote for one or more tenders. The aims are to select qualified contractors to design, supply, and install the necessary infrastructure to support CPI's operational needs, aligning with their ongoing commitment to innovation and sustainability.
CPI requires a suitable contractor to relocate the existing Bin Store, to supply and construct a new smaller bin store, approximately 4 meters by 3 meters, with a new concrete base and basic internal lighting. Groundworks required following the relocation of the existing Bin Store include excavating the existing concrete slab and casting a new, suitably thick base to support the new UPS GRP enclosure and its contents.
The successful contractors will be required to deliver the necessary stages to ultimately provide a robust and efficient power solution, which will include integrating the UPS system and generator link into the existing electrical network. All work should be carried out in compliance with current regulations and best practices to meet CPI's high standards for safety, reliability, and performance.
Award information
Awarded date
3 March 2025
Contract start date
3 March 2025
Contract end date
2 March 2026
Total value of contract
£63,129.20
This contract was awarded to 1 supplier.
FEG Ltd
Address
5 Bede House, Tower Road, Washington, Tyne and Wear, United Kingdom, NE37 2SH
Reference
None
About the buyer
Contact name
Procurement Department
Address
Wilton Centre
Wilton
REDCAR
TS104RF
United Kingdom
Telephone
+44 01740625716
Share this notice
Closing: 13 February 2025, 12pm