Published date: 9 May 2018
Closed future opportunity - This means that a potential contract has passed its approach to market date. A buyer can choose to consider any supplier interest or convert this notice into an opportunity ready for live procurement.
Contract summary
Industry
Construction work - 45000000
Location of contract
CM5 9LA
Value of contract
£2,200,000
Procurement reference
PSBP2046
Published date
9 May 2018
Approach to market date
23 May 2018
Contract start date
26 July 2018
Contract end date
24 December 2019
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
This opportunity relates to the refurbishment of Chipping Ongar Primary School (COPS) as part of the Priority Schools Building Programme Phase 2 (PSBP2). The PSBP2 programme was launched on 1 May 2014 to undertake major rebuilding and refurbishment projects, addressing the needs of schools in poor condition.
COPS is a mixed primary school for ages 4 to 11, situated in Greensted Road, Ongar, CM5 9LA.
The school consists of two main blocks (EFAA and EFAB) of varying forms and types of construction, located to the northern end of the school site. The blocks are interconnected via a glazed atrium. Hard play areas are located to the east, south and west of the main school blocks, and a playing field to the south. The school site has a total area of approximately 6 acres.
The project is to refurbish the existing block EFAA, which has an approximate GIA of 1,410sq/m, in order to achieve the necessary 15 year residual design life applicable to PSBP2 schemes. Block EFAA includes a nursery which is outside of the scope of works. The total funded area for refurbishment represents approximately 1,305sq/m. Block EFAB is outside of the scope of works.
Block EFAA was built circa 50 years ago and features traditional construction with cavity brickwork and full-height window panels with aluminium finish and double glazed window units. The key works for the scheme include, but is not limited to:
• Replacement of the flat roof finish
• Renewal of roof drainage system
• Replacement of the majority of window units and repair of retained window units
• Renewal of ceiling finishes
• Replacement of LTHW radiators and fan convectors.
The works will be completed in a phased manner. Initial proposals negate temporary accommodation blocks, with surplus space within the school being used as temporary classroom space.
One contractor is required to manage and deliver these work. The successful contractor will be appointed under PCSA to finalise design prior to being appointed via a JCT Design & Build Contract. PCSA appointment is anticipated Jul-18. JCT D&B Contract sign is anticipated Apr-19. Works are anticipated to be completed by Dec-19.
The School must remain fully operational for the duration of the works.
More information
Spend profile
| Financial year | Budget |
|---|---|
| 2019/2020 | £2,200,000 |
Additional text
-
If you are interested in this tender, please contact Nick Edwards at Turner & Townsend.
The scheme procurement will be administered using the AWARD e-portal. In order to gain access to AWARD, bidders will be required to submit confirmation to the appointed Administrators of AWARD (Turner & Townsend - pm27821@turntown.com) and request login details. Once submitted you will be sent a link to the AWARD log-in page along with a password, which should be changed immediately. An AWARD user guide is included as part of the ITT pack of information, which will be available on AWARD.
About the buyer
Contact name
Nick Edwards
Address
One New Change
London
EC4M 9AF
England
Telephone
07483122280
Share this notice
Approach to market date: 23 May 2018
All content is available under the