Published date: 9 May 2024
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Hydrogen, argon, rare gases, nitrogen and oxygen - 24111000
Parts of gas generators - 31161800
Compressed-air dryers - 39721321
Parts of air compressors - 42124330
Parts of gas compressors - 42124340
Taps, cocks, valves and similar appliances - 42130000
Valves defined by function - 42131100
Pressure-reducing, control, check or safety valves - 42131140
Pressure-reducing valves - 42131141
Control valves - 42131142
Process-control valves - 42131144
Check valves - 42131145
Needle valves - 42131250
Ball valves - 42131260
Diaphragm valves - 42131290
Pneumatic valve actuators - 42132130
Air filters - 42514310
Storage tanks - 44611400
Gas cylinders - 44612100
Gas tanks - 44612200
Gas regulation equipment installation work - 45333100
Water demineralisation services - 65121000
Location of contract
OX14 3DB
Value of contract
£1,500,000 to £2,000,000
Procurement reference
20240509173805-72814
Published date
9 May 2024
Closing date
10 June 2024
Closing time
12pm
Contract start date
5 August 2024
Contract end date
16 July 2027
Contract type
Service contract
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
The United Kingdom Atomic Energy Authority (UKAEA) requirement is for the procurement of a process services system for the Hydrogen 3 Advanced Technology (H3AT) facility at Culham. Included is the supply of Demineralised Water, Breathable Air Supply, Plant Air Supply, Compressed Gas Supply, Specialist Gas Compound with Segregation.
Scope - The contractor will be responsible for the design, manufacture, assembly, Factory Acceptance Testing, delivery and installation, Operating Qualification, Site Acceptance Testing (SAT), handover, conformity assessment and support for all the installed equipment and pipework required.
Duration and Contract - The scope of work is expected to be delivered by March 2026, with an estimated duration of 23 months. The proposed form of contract is the NEC4 Engineering Construction Contract (ECC) Option A, for a fixed price. There may also be the need for additional ad hoc work not defined within the Scope of Works, which will be reimbursed for which bidders are asked to provide a schedule of rates.
Design - The Contractor is fully responsible for the design of the entire system. The Contractor will be responsible for the concept design, preliminary and detailed design of the system. The Contractor will be responsible for obtaining UKAEA approval for the design in all phases, ensuring that the design meets all safety and quality standards.
Manufacturing, Installation & Testing, Delivery, Commissioning - For all the items that require manufacture and assembly, the Contractor shall undertake Factory Acceptance Testing to demonstrate the functionality.
Engineering Support - The Contractor is responsible for completing all the required tests for all process services items according to the Inspection and Test Plan (ITP), providing test reports, including Site Acceptance Test (SAT) and Operating Qualification (OQ), that are approved by the UKAEA.
More information
Links
About the buyer
Contact name
Viv Hichens
Address
Culham Campus
Abingdon
OX14 3DB
ENG
Website
www.gov.uk/government/organisations/uk-atomic-energy-authority
Share this notice
Closing: 10 June 2024, 12pm