Published date: 14 June 2021
Last edited date: 30 June 2021
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Hydrogen, argon, rare gases, nitrogen and oxygen - 24111000
Magnets - 31630000
Pressure vessels - 44615000
Location of contract
B15 2TT
Value of contract
£0 to £610,000
Procurement reference
SC9230/21
Published date
14 June 2021
Closing date
21 July 2021
Closing time
12am
Contract start date
11 August 2021
Contract end date
28 February 2022
Contract type
Supply contract
Procedure type
Open procedure (above threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
This project is funded by the UK Research and Innovation (UKRI) Industrial Strategy Challenge Fund; Driving the Electric Revolution under grant agreement 1524086
The University of Birmingham invites tenders for supply of a bespoke, hydrogen processing of magnet scrap (HPMS) vessel. The HPMS vessel will be the largest magnet recycling plant of its kind in the UK and will focus on processing of end of life magnets containing magnetic scrap.
The HPMS vessel is based on a patented technology, developed at the University of Birmingham, in which hydrogen is used to extract neodymium-iron-boron (Nd-Fe-B) magnet powder from end of life permanent magnet containing products. During the HPMS process, sintered Nd Fe B magnets, which are embedded in end of life products, are loaded inside a vessel, which is then sealed, evacuated, back filled with an inert gas (e.g. Argon or Nitrogen), evacuated and then filled with between 1-4 bar of hydrogen at room temperature for between 1-4 hours. Once exposed to hydrogen, the sintered Nd-Fe-B undergoes the hydrogen decrepitation (HD) process and breaks down into a friable, demagnetised, hydrogenated powder.
Often the end of life products containing the Nd Fe-B material are encased within some sort of housing so the hydrogenated powder needs to be liberated from the scrap using mechanical agitation through a porous sieve stage. This is typically performed by rotating the scrap within a porous drum (3-5 mm pore size) within the HPMS vessel, after which the powder falls into a sealable collection pot at the bottom of the vessel, which can then be unloaded under an argon or nitrogen atmosphere (O2 = < 5 ppm).
It would be an advantage if the HPMS vessel could be inertly loaded with scrap in this application through a hopper system or that flanges were in place to retro-fit this.
The extracted alloy powder will be converted into recycled NdFeB magnets using further processes, which do not form part of this tender.
The HPMS process has already been demonstrated at the 5 kg scale using a 300 L vessel at the University of Birmingham. The main objective of the new HPMS vessel will be to scale this technology up to 200-300 kg batch sizes.
Note, due to the space requirements of the system, the large scale HPMS vessel will be installed at the Tyseley Energy Park (TEP).
The overall budget for this item is up to £610,000 excluding VAT.
More information
Links
-
- https://in-tendhost.co.uk/universityofbirmingham/aspx/
- Tender notice
- Additional information on how to apply for this contract
About the buyer
Contact name
Rachel Price
Address
Edgbaston
Edgbaston
Edgbaston
B15 2TT
United Kingdom
Telephone
0121 414 9055
Share this notice
Closing: 21 July 2021, 12am