Published date: 13 April 2015
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Boiler installations - 42160000
Boilers - 44621200
Central-heating boilers - 44621220
Boiler installation work - 45331110
Location of contract
DE22 1GB
Value of contract
£0
Procurement reference
KRBOILER/ICC/2015
Published date
13 April 2015
Closing date
1 May 2015
Contract start date
18 May 2015
Contract end date
2 November 2015
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
The Services Contractor shall supply, install, test and commission the installations as detailed on the Tender drawings and
within this specification, employing skilled personnel and specialist contractors as necessary to achieve the standards
described.
The works include the supply, installation, testing and commissioning of new replacement boilers, builders work, CHP, chiller,
BMS controls, back up HWS generation, new replacement pumps, new pipework and associated mechanical and electrical
services within the East Tower and North Tower plantrooms at the University of Derby, Kedleston Road Campus in Derby.
The works shall also include the isolation, de-commissioning, strip-out and removal from site of the existing boiler plant, chiller,
pumps, pipework control wiring and associated installations made redundant by the replacement boiler/chp/chiller installation.
The Mechanical Contractor shall supply, install, test and commission the installations as detailed on the Tender drawings and
within this Specification, employing skilled personnel and specialist contractors as necessary to achieve the standards
described. The works are to be carried out two phases, Phase 1 to provide direct gas fired HWS generation to cover the
summer period and when commissioned and operational to remove the existing boiler plant, controls, pipework pumps and
Install new boiler plant pipework, pumps, controls, pipework and chillers before 1st September 2015. Phase 2 to de commission
the R22 chiller and remove, install the new CHP, complete the chilled water system and commission and then complete and
commission the CHP by the 2nd November 2015.
Contract is to be MF/1
All of works are to be carried out to the agreed programme and completed by 02/11/15.
The project shall be phased to ensure minimum disruption is caused on site.
The contract intended programme requirements are appended to this section of the Specification.
Date for Commencement of the works (to allow plant lead-in periods): 11/05/15
Date for start on site: 11/05/15
Date for Completion Phase 1: 31/08/15
Date for start of Phase 2: 14/09/15
Date for Completion Phase 2: 02/11/15
The Services Contractor will be required to prepare a master programme and progress chart to clearly indicate how the work is
to be carried out to completion within the period of the Contract.
To arrange a site visit please contact Ian Cain on 01332 591104 or i.cain@derby.ac.uk or Martin Simms on 01332 591107 or m.simms@derby.ac.uk
More information
Links
-
- https://in-tendhost.co.uk/derby/aspx/
- Tender notice
- Additional information on how to apply for this contract
Additional text
-
Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/derby/aspx/
About the buyer
Contact name
ADMINISTRATOR ADMINISTRATOR
Address
Derby
Derby
Derby
DE22 1GB
Andorra
Telephone
01332 592401
Share this notice
Closing: 1 May 2015
All content is available under the