Published date: 13 April 2015

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 1 May 2015

Contract summary

Industry

  • Boiler installations - 42160000

  • Boilers - 44621200

  • Central-heating boilers - 44621220

    • Boiler installation work - 45331110

Location of contract

DE22 1GB

Value of contract

£0

Procurement reference

KRBOILER/ICC/2015

Published date

13 April 2015

Closing date

1 May 2015

Contract start date

18 May 2015

Contract end date

2 November 2015

Contract type

Works

Procedure type

Open procedure

Any interested supplier may submit a tender in response to an opportunity notice.

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

The Services Contractor shall supply, install, test and commission the installations as detailed on the Tender drawings and
within this specification, employing skilled personnel and specialist contractors as necessary to achieve the standards
described.
The works include the supply, installation, testing and commissioning of new replacement boilers, builders work, CHP, chiller,
BMS controls, back up HWS generation, new replacement pumps, new pipework and associated mechanical and electrical
services within the East Tower and North Tower plantrooms at the University of Derby, Kedleston Road Campus in Derby.
The works shall also include the isolation, de-commissioning, strip-out and removal from site of the existing boiler plant, chiller,
pumps, pipework control wiring and associated installations made redundant by the replacement boiler/chp/chiller installation.


The Mechanical Contractor shall supply, install, test and commission the installations as detailed on the Tender drawings and
within this Specification, employing skilled personnel and specialist contractors as necessary to achieve the standards
described. The works are to be carried out two phases, Phase 1 to provide direct gas fired HWS generation to cover the
summer period and when commissioned and operational to remove the existing boiler plant, controls, pipework pumps and
Install new boiler plant pipework, pumps, controls, pipework and chillers before 1st September 2015. Phase 2 to de commission
the R22 chiller and remove, install the new CHP, complete the chilled water system and commission and then complete and
commission the CHP by the 2nd November 2015.


Contract is to be MF/1

All of works are to be carried out to the agreed programme and completed by 02/11/15.
The project shall be phased to ensure minimum disruption is caused on site.
The contract intended programme requirements are appended to this section of the Specification.
Date for Commencement of the works (to allow plant lead-in periods): 11/05/15
Date for start on site: 11/05/15
Date for Completion Phase 1: 31/08/15
Date for start of Phase 2: 14/09/15
Date for Completion Phase 2: 02/11/15
The Services Contractor will be required to prepare a master programme and progress chart to clearly indicate how the work is
to be carried out to completion within the period of the Contract.

To arrange a site visit please contact Ian Cain on 01332 591104 or i.cain@derby.ac.uk or Martin Simms on 01332 591107 or m.simms@derby.ac.uk


More information

Links

Additional text

Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/derby/aspx/


About the buyer

Contact name

ADMINISTRATOR ADMINISTRATOR

Address

Derby
Derby
Derby
DE22 1GB
Andorra

Telephone

01332 592401

Email

j.brailsford@derby.ac.uk