Published date: 9 November 2016
This notice was replaced on 9 November 2016
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Awarded contract (published 3 February 2017)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Laboratory, optical and precision equipments (excl. glasses) - 38000000
Command and control system - 42961000
Casks - 44614000
Location of contract
North East
Value of contract
£250,000 to £550,000
Procurement reference
619
Published date
9 November 2016
Closing date
14 December 2016
Contract start date
22 December 2016
Contract end date
21 December 2018
Contract type
Supply contract
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
This contract is for the Supply, Installation and Commissioning of a Powders Pack Filling Research Line including necessary support/access frames and programmable logic controller based control system. This is divided into five lots:
Lot 1 - Design, Supply, Installation and Commissioning of a powder storage bin
Lot 2 - Supply, Installation and Commissioning of a powder flow control device
Lot 3 - Supply, Installation and Commissioning of a powder sifter
Lot 4 - Supply, Installation and Commissioning of a powder filling machine
Lot 5 - Design, Supply, Installation and Commissioning of a PLC based integrated control system, specified instrumentation and the full system integration of lots 1 to 5.
The scope of contract includes but is not limited to the sourcing and supply of component parts, any design or engineering work required, integration of component parts and installation of a control system.
The scope of contract includes but is not limited to the sourcing and supply of component parts, any design or engineering work required, integration of component parts. Installation of a control system is to be done by others. There will be a requirement to provide any necessary information and coordination that others may need.
About the buyer
Contact name
David Cooper
Address
Wilton Centre
Wilton
Redcar
TS10 4RF
England
Share this notice
All content is available under the
