Published date: 18 June 2015
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Structures and parts of structures - 44210000
Bridge - 44212100
Bridge sections - 44212110
Structures of bridges - 44212120
Building construction work - 45210000
Construction work for bridges and tunnels, shafts and subways - 45221000
Construction work for bridges - 45221100
Bridge construction work - 45221110
Road bridge construction work - 45221111
Railway bridge construction work - 45221112
Construction work for iron bridges - 45221114
Construction work for steel bridges - 45221115
Location of contract
South West
Value of contract
£250,000
Procurement reference
325053087
Published date
18 June 2015
Closing date
6 July 2015
Contract start date
10 August 2015
Contract end date
8 February 2016
Contract type
Works
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
Suppliers must have previous experience of manufacture and installation of bridges. Lodgemore Lane Lifting Bridge is to be located on the site of an existing fixed bridge which once formed a swing bridge built in the 1940`s to replace an earlier swing bridge. The bridge is a mixed usage bridge which also acts as one of two primary routes across a presently unrestored section of the Stroudwater canal to the WSP Lodgemore Textile Mill. The existing fixed bridge is to be demolished and replaced by a manually operated overhead counterweight lifting bridge. The scope of the Contract is for the Contractor to act as Principle Contractor under CDM and undertake the detail design, manufacture, works assembly, works testing, transport to site, erection, site testing, commissioning, complete documentation, including Operational and Maintenance (O&M) Manuals information for Health & Safety file and Technical file for, CE Marking, facilities for full testing, software and programming tools and setting to work of: Demolishing, removal and disposal of the existing bridge deck. A new overhead counterweight lifting bridge with fabricated bridge deck and fabricated counterweight superstructure complete with parapets andsurfacing. Demolishing, removal and disposal of the existing bridge foundations. New civil works foundations at the nose and tail of the bridge. Manually operated traffic barriers on both the North and South approachesto the bridge. Cabling and wiring including containment and draw pits for the site asrequired by the new systems (If required) Street furniture bollards on the North and South approaches to the bridge. A new operators pedestal containing the manually operated hydraulicpump for lifting the bridge. Bridge bearings. Other more minor items as further described in the system documentation
More information
Links
-
- https://www.supplyingthesouthwest.org.uk/procontract/supplier.nsf/frm_opportunity?OpenForm&contract_id=CONTRACT-9X4E-WFUZ39
- Tender notice
- Provider contract link
Additional text
-
The scope of the Contract is for the Contractor to act as Principle Contractor under CDM and undertake the detail design, manufacture, works assembly, works testing, transport to site, erection, site testing, commissioning, complete documentation, including Operational and Maintenance (O&M) Manuals information for Health & Safety file and Technical file for, CE Marking, facilities for full testing, software and programming tools and setting to work of: Demolishing, removal and disposal of the existing bridge deck. A new overhead counterweight lifting bridge with fabricated bridge deck and fabricated counterweight superstructure complete with parapets and surfacing. Demolishing, removal and disposal of the existing bridge foundations. New civil works foundations at the nose and tail of the bridge. Manually operated traffic barriers on both the North and South approaches to the bridge. Cabling and wiring including containment and draw pits for the site as required by the new systems (If required) Street furniture bollards on the North and South approaches to the bridge. A new operators pedestal containing the manually operated hydraulic pump for lifting the bridge. Bridge bearings. Other more minor items as further described in the system documentation.
About the buyer
Contact name
David Marshall
Address
Ebley Mill
Ebley Wharf
Westward Road, Stroud
GL5 4UB
UK
Telephone
01453 754646
Website
https://www.supplyingthesouthwest.org.uk/procontract/supplier.nsf
Share this notice
Closing: 6 July 2015
All content is available under the