Published date: 18 June 2015

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 6 July 2015

Contract summary

Industry

  • Structures and parts of structures - 44210000

  • Bridge - 44212100

  • Bridge sections - 44212110

    • Structures of bridges - 44212120

    • Building construction work - 45210000

    • Construction work for bridges and tunnels, shafts and subways - 45221000

    • Construction work for bridges - 45221100

    • Bridge construction work - 45221110

    • Road bridge construction work - 45221111

    • Railway bridge construction work - 45221112

    • Construction work for iron bridges - 45221114

    • Construction work for steel bridges - 45221115

Location of contract

South West

Value of contract

£250,000

Procurement reference

325053087

Published date

18 June 2015

Closing date

6 July 2015

Contract start date

10 August 2015

Contract end date

8 February 2016

Contract type

Works

Contract is suitable for SMEs?

No

Contract is suitable for VCSEs?

No


Description

Suppliers must have previous experience of manufacture and installation of bridges. Lodgemore Lane Lifting Bridge is to be located on the site of an existing fixed bridge which once formed a swing bridge built in the 1940`s to replace an earlier swing bridge. The bridge is a mixed usage bridge which also acts as one of two primary routes across a presently unrestored section of the Stroudwater canal to the WSP Lodgemore Textile Mill. The existing fixed bridge is to be demolished and replaced by a manually operated overhead counterweight lifting bridge. The scope of the Contract is for the Contractor to act as Principle Contractor under CDM and undertake the detail design, manufacture, works assembly, works testing, transport to site, erection, site testing, commissioning, complete documentation, including Operational and Maintenance (O&M) Manuals information for Health & Safety file and Technical file for, CE Marking, facilities for full testing, software and programming tools and setting to work of: Demolishing, removal and disposal of the existing bridge deck. A new overhead counterweight lifting bridge with fabricated bridge deck and fabricated counterweight superstructure complete with parapets andsurfacing. Demolishing, removal and disposal of the existing bridge foundations. New civil works foundations at the nose and tail of the bridge. Manually operated traffic barriers on both the North and South approachesto the bridge. Cabling and wiring including containment and draw pits for the site asrequired by the new systems (If required) Street furniture bollards on the North and South approaches to the bridge. A new operators pedestal containing the manually operated hydraulicpump for lifting the bridge. Bridge bearings. Other more minor items as further described in the system documentation


More information

Links

Additional text

The scope of the Contract is for the Contractor to act as Principle Contractor under CDM and undertake the detail design, manufacture, works assembly, works testing, transport to site, erection, site testing, commissioning, complete documentation, including Operational and Maintenance (O&M) Manuals information for Health & Safety file and Technical file for, CE Marking, facilities for full testing, software and programming tools and setting to work of: Demolishing, removal and disposal of the existing bridge deck. A new overhead counterweight lifting bridge with fabricated bridge deck and fabricated counterweight superstructure complete with parapets and surfacing. Demolishing, removal and disposal of the existing bridge foundations. New civil works foundations at the nose and tail of the bridge. Manually operated traffic barriers on both the North and South approaches to the bridge. Cabling and wiring including containment and draw pits for the site as required by the new systems (If required) Street furniture bollards on the North and South approaches to the bridge. A new operators pedestal containing the manually operated hydraulic pump for lifting the bridge. Bridge bearings. Other more minor items as further described in the system documentation.


About the buyer

Contact name

David Marshall

Address

Ebley Mill
Ebley Wharf
Westward Road, Stroud
GL5 4UB
UK

Telephone

01453 754646

Email

david.marshall@stroud.gov.uk

Website

https://www.supplyingthesouthwest.org.uk/procontract/supplier.nsf