Published date: 27 May 2022

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 4 July 2022, 12pm

Contract summary

Industry

  • Street-lighting equipment - 34928500

  • Street-lighting columns - 34928510

  • Street-lighting maintenance services - 50232100

Location of contract

England

Value of contract

£300,000

Procurement reference

GLOSCC001-DN614975-92800324

Published date

27 May 2022

Closing date

4 July 2022

Closing time

12pm

Contract start date

31 October 2022

Contract end date

31 December 2022

Contract type

Works

Procedure type

Other

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

Yes


Description

On Metz Way Gloucester, Gloucestershire County Council (GCC), Has 9no. existing 30m Highmast lighting units which have been insitu for over 20 years, as they have exceeded their structural design life and electrically, they are inefficient as they use 8no. 400w High Pressure Sodium fittings on each Highmast to illuminate the highway. As a result of the above, Gloucestershire County Council (GCC) have decided to replace four of the Highmasts units with shorter 20m Highmast units which will be less obtrusive and more energy efficient. These new units shall be manufactured with a flange plate that will enable the new Highmast to utilise the existing Highmast bases. The other five Highmast units are to be removed and existing bases protected. Following the removal of certain Highmasts, the highway will be illuminated using conventional street lighting columns with new LED lanterns.

It is essential the Contractor undertakes a physical inspection of the whole site to familiarise themselves with the working environment and the terrain on which the works will be undertaken. They must satisfy themselves that they can complete all the "Works" as specified in this document in a safe manner. The site inspection should focus on issues like the existing terrain, the existing Highmast Bases, the adjacent busy Rail Tracks, and the overgrown sloping grassed banks etc, all of which will have a factor in how the installation works will or can be undertaken.

Due to the nature of the work involved on this scheme, GCC believe the Contractor undertaking this work should be Competent and Experienced in all aspects of Highmast installation, street lighting installation and be able to undertake all aspects of Civils works required (trenching, and ducting) etc. The Contractor will also be required to undertake most of the work at night or during "off peak" hours during the day, to reduce the disruption on a busy "Traffic Sensitive" main road.
The Contractor shall return with the tender documents its registration/membership details of the appropriate Professional Organisations such as HERS, NICEIC
As this work will be undertaken soon after the Bird Nesting Season, it will be the Contractor responsibility to check the shrubbery for nesting Birds, when undertaking the Shrub Clearance work as specified and as required for their works. This work shall be undertaking by a Competent Arboriculturally Contractor.
All highway electrical works on site shall be carried out by qualified and competent operatives registered under the Highways Electrical Register Scheme (HERS).

The Contractor will be responsible for arranging all DNO/GCC Electrical Connections and Disconnections as required by the scheme.

Full details are on https://procontract.due-north.com/Procurer/Advert/View?advertId=3b4127b9-c0dd-ec11-8114-005056b64545&fromAdvertEvent=True


About the buyer

Contact name

Mike McGowan

Address

Shire Hall
Gloucester
GL1 2TH
England

Telephone

+44 1452328900

Email

mike.mcgowan@gloucestershire.gov.uk

Website

https://www.gloucestershire.gov.uk