Published date: 7 February 2023
Last edited date: 7 February 2023
This notice was replaced on 7 February 2023
This notice does not contain the most up-to-date information about this procurement. The most recent notice is:
Opportunity (published 7 February 2023, last edited 13 March 2023)
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Lifting and handling equipment - 42410000
Cranes - 42414100
Mechanical lifts - 42416130
Lifting, handling, loading or unloading machinery - 42418000
Demolition work - 45111100
Dismantling works - 45111300
Siteworks - 45113000
Waste disposal site construction work - 45222110
Cladding works - 45262650
Structural engineering consultancy services - 71312000
Environmental impact assessment for construction - 71313400
Waste analysis services - 79723000
Asbestos removal services - 90650000
Location of contract
TN29 9PP
Value of contract
£90,100,000
Procurement reference
CF-0029500D4L000000iAvzUAE
Published date
7 February 2023
Closing date
13 March 2023
Closing time
11am
Contract start date
23 September 2024
Contract end date
30 September 2030
Contract type
Works
Procedure type
Competitive procedure with negotiation (above threshold)
Anyone may ask to participate, but only those who are pre-selected will be invited to submit initial tenders and to negotiate.
This procedure can be used for procurements above the relevant contract value threshold.
Contract is suitable for SMEs?
No
Contract is suitable for VCSEs?
No
Description
Dungeness 'A' is a redundant nuclear power station located on the Romney Marsh in Kent. The power station ceased generation in 2006 and is currently undergoing decommissioning.
The scope of works is for the Contractor to undertake the role of "Principal Contractor" for the safe removal of all hazards including Asbestos Containing Materials (ACM's), soft stripping internal fixtures, fittings & linings and removal of the Boilers, by pass ducts, main gas duct sections, suitable laydown and weatherproof storage. The safe demolition of the buildings adjoining the east and west faces of the reactor buildings of the Dungeness A Site, noting the Blower Halls and Central Control Block are reduced to slab level with other buildings reduced as stated in the scope of works and in accordance with BS6187:2011 Code of Practice for Full and Partial Demolition (Ref. 16.4.1).
To provide some idea of scale, Dungeness has eight boilers which will require removal and laydown. These are estimated at 7m in diameter and 21m long, they weigh approximately 700 tonnes each. Approximately 30% of the building structures currently on Site will be removed by the contract.
The Client will apply for any necessary planning permissions and carry out any activities necessary to obtain the Planning Approval. The Contractor is to provide all management, documentation, labour, plant, equipment, and materials to remove the hazards, de-plant all equipment, lifting and removal of the Boilers, by pass ducts, main gas duct sections, suitable laydown and weatherproof storage, demolition of the buildings and make good weatherproof of remaining structures including site remediation.
The scope of this project includes the preparation and execution of all necessary investigation work such as ground, geological, ordnance, camera, flow surveys, etc. necessary to complete the scope of works.
The procurement documents are available at https://one-nda.force.com/s/Welcome. Tenders to requests to participate must be submitted electronically via https://one-nda.force.com/s/Welcome
More information
Previous notice about this procurement
Package 1: Demolition & Boiler and ancillary equipment removal (Dungeness)
- Opportunity
- Published 7 February 2023
About the buyer
Contact name
Nicola Smith-Lee
Address
Dungeness A Site
Romney Marsh
TN29 9PP
GB