Published date: 16 October 2020
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Construction, foundation and surface works for highways, roads - 45233000
Location of contract
Yorkshire and the Humber
Value of contract
£339,863.54
Procurement reference
NYCC001-DN493044-14627996
Published date
16 October 2020
Closing date
4 September 2020
Closing time
12pm
Contract start date
28 September 2020
Contract end date
10 October 2020
Contract type
Works
Procedure type
Restricted procedure
A two-stage procedure, where the first stage is used to select suppliers, who are then invited to bid in the second stage.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Queen Street, Scarborough:
Plane off 120mm of existing bituminous carriageway surfacing on Queen Street, Resurface with 20mm SAMI layer and 2 x 50mm HRA 35/14 WTR 2 surface course. 14/20 PCC 65 PSV (top layer only). Total Area in Queen Street is 2,148m2.
11m of sandstone kerbing to replace on Queen Street.
New thermoplastic road markings shall be applied throughout the extents of the scheme. Ironworks shall be adjusted to suit carriageway levels or as directed by the engineer.
Newborough/ Eastborough, Scarborough:
Plane off 120mm of existing bituminous carriageway surfacing on Newborough / Eastborough, Resurface with 20mm SAMI layer and 2 x 50mm HRA 35/14 WTR 2 surface course 14/20 PCC 65 PSV (top layer only). The area of this section is 2,976m2. The 50m approach to the Stop line at the bottom end of Eastborough to be laid in 68PSV (212m2). Total Area in Newborough and Eastborough is 3,188m2.
New thermoplastic road markings shall be applied throughout the extents of the scheme. Ironworks shall be adjusted to suit carriageway levels or as directed by the engineer.
The Grand Total area for both sections is 5,336m2
The Contractor shall allow in his programme for all milled surfaces to be inspected by the Engineer during daylight hours, in order that any areas of defective concrete or sub-base can be identified and remedial measures designed and implemented in advance of laying any SAMI or Binder courses.
The Contractor shall make available during the day following any pavement milling, any such plant. materials, and labour that might reasonably be anticipated to be required to enable remedial works to be undertaken to defective concrete or other sub-base prior to the commencement of night works.
Core results indicate the depth to concrete varies significantly throughout the scheme extents so the surfacing material and thickness of layers may change after the Engineer has inspected the concrete and sub-base areas after the milling has been completed.
Award information
Awarded date
8 September 2020
Contract start date
28 September 2020
Contract end date
10 October 2020
Total value of contract
£264,365.18
This contract was awarded to 1 supplier.
Lane Rental Services Limited
Address
Pocklington Industrial Estate, Pocklington, York, North Yorkshire, YO42 1NR
Reference
None
Supplier is SME?
Yes
Supplier is VCSE?
No
About the buyer
Address
North Yorkshire County Council
County Hall
Northallerton
DL7 8AD
England
Website
Share this notice
Closing: 4 September 2020, 12pm