Published date: 20 October 2017
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Drainage construction works - 45232450
Location of contract
East Midlands
Value of contract
£30,000
Procurement reference
tender_156054/627120
Published date
20 October 2017
Closing date
3 November 2017
Contract start date
27 November 2017
Contract end date
20 December 2017
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
2.1.1 The principal aim of this study is to investigate the water quality of three highway drainage outfall points on the A14 between Junction 19 (M1 / Swinford) and Junction 13 (A45 and A605 / Thrapston), and their impact on the quality of receiving watercourses.
2.1.2 To achieve the aim, the Contractor will undertake and complete the following study-specific objectives:
• To undertake targeted sampling surveys;
(1) Water sampling at the point of outlet to determine quality of highways runoff;
(2) Sediment sampling within concrete-lined ditches between outlet and outfall, where requested;
(3) Upstream and downstream water and sediment sampling within receiving watercourses.
• To examine water and sediments samples by analytical testing of suites representative of highways pollutants.
2.2 Project objectives: A43 Ponds Study
2.2.1 The principal aim of this study is to investigate the water quality of 13 balancing ponds on the A43 between Rothersthorpe (A5123 / M1 Junction 15a) and Fewcott / Stoke Lyne (M40 Junction 10), and impact on the quality of receiving waterbodies.
2.2.2 To achieve the aim, the Contractor will undertake and complete the following study-specific objectives:
• To undertake targeted sampling surveys;
(1) Water sampling within manholes to determine quality of highways runoff, where requested;
(2) Water and sediment sampling within Pollution Containment Tanks (PCT);
(3) Water and sediment sampling within the balancing pond system, at closest point to outlet from PCT and prior to outfall into receiving watercourse;
(4) Upstream and downstream water and sediment sampling within receiving waterbodies, where requested.
• To examine water and sediments samples by analytical testing of suites representative of highways pollutants.
2.2.3 Location plans for outfalls and ponds, including parking and accessibility, and proposed sampling points and number of samples required
About the buyer
Contact name
Stewart Wright
Address
Stirling House, Annesley
Nottinghamshire
NG15 0DS
England
Share this notice
Closing: 3 November 2017
All content is available under the