Published date: 25 February 2020
Last edited date: 9 March 2020
Closed future opportunity - This means that a potential contract has passed its approach to market date. A buyer can choose to consider any supplier interest or convert this notice into an opportunity ready for live procurement.
Contract summary
Industry
Construction work - 45000000
Location of contract
EC1V 1JX
Value of contract
£2,828,000
Procurement reference
Wac
Published date
25 February 2020
Approach to market date
16 March 2020
Contract start date
16 October 2020
Contract end date
9 April 2021
Procedure type
Open procedure (below threshold)
Any interested supplier may submit a tender in response to an opportunity notice.
This procedure can be used for procurements below the relevant contract value threshold.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
The Department for Education requires a suitably experienced D&B Contractor to express their interest to undertake refurbishment/remodelling works. Once completed the school will provide accommodation for 150 pupils.
The proposed site is a 6-storey building, including ground and lower ground floor. The building is located on City Road, EC1V 1JX, London. Majority of internal spaces require refurbishment/decoration whereas, two double height spaces are required to be built on 3rd floor. This will require removal of concrete floor slab between the 3rd and 4th floors. Additionally, the existing kitchen located with the basement will be remodelled with the creation of a new riser to facilitate enhanced catering facilities.
No significant internal works are expected to take place in the immediate vicinity of the party wall, with the exception of some possible M&E-related enabling works (subject to contractor design). However, there is a live sub-station on the lower ground floor which requires unhindered access by UKPN at all times. This sub-station does not have direct street access and so liaison will be required (between Contractor and UK Power Networks Ltd) to coordinate an agreeable access/security methodology.
The proposals require little in the way of external works with the most notable being the external sealing of the main stairwell window frame as well as the replacement of some openable casements on upper floors. Such works require relatively little time working at height and (effectively) beyond the site demise/ in the public realm, and so it seems likely that a mobile platform/ cherry picker style method of working, combined with requisite permissions/ temporary pavement closure, will be required.
Currently the existing building serves as an educational establishment and so the current security standard/principles should already comply with DfE's minimum requirements and the College's basic needs. The building already incorporates robust materials at ground floor level as well as external CCTV at entry points as a minimum.
More information
Spend profile
| Financial year | Budget |
|---|---|
| 2020/2021 | £2,828,000 |
Additional text
-
ITT will be issued on 16 March 2020 with response due on 10 April 2020.
About the buyer
Contact name
Farhan Aslam
Address
155 Moorgate
London
EC2M6XB
England
Telephone
07917208575
Share this notice
Approach to market date: 16 March 2020
All content is available under the