Published date: 16 September 2021
Awarded contract - This means that the contract has been awarded to a supplier.
Contract summary
Industry
Consultative engineering and construction services - 71310000
Location of contract
South East
Value of contract
£25,543
Procurement reference
tender_285774/998143
Published date
16 September 2021
Closing date
25 July 2021
Closing time
11am
Contract start date
26 July 2021
Contract end date
2 August 2021
Contract type
Service contract
Procedure type
Call-off from a framework agreement
A mini-competition or direct purchase from a pre-established framework agreement.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
The Control Panel scope of work which we propose to undertake is as follows:1. Design, manufacture and delivery of 1x form 2 BMS Control Panel. 2. Fitting and wiring of free issue Controller, displays, modules and network equipment. We have allowed to upgrade the existing Trend obsolete IQ2 Series control with the latest Trend IQ4e controllers. 3. To supply and install a new Trend IQView4 display panel so that settings can be changed locally from the front of the new control panel. 4. Factory Inspection & Testing of control panels. 5. Documentation & certification package. Panel changeover scope of work which we propose to undertake is as follows:1. Isolate, test and make-safe to MCC and control enclosure.
2. Disconnect existing cabling from both, retain the MCC gland plate if any cables cannot be re-glanded. 3. Mount new combined Form 2 MCC/Control enclosure in position vacated by the old MCC. 4. Allowance for new panel is 20x drives/feeds & 41x points (based on the supplied panel drawings and load list) 5. Divert existing control cabling to new panel (some cabling may need a small JB, included). 6. Re terminate all. 7. Existing field cablingassumed suitable for re-use. 8. Existing sensors and control devices to be retained. 9. Existing feed to be reused, assumed as sufficient capacity. 10. Dispose of old panels via a registered waste contractor. 11. Issue minor works cert. BMS Commissioning1. To create energy efficient software associated with the existing mechanical plant. 2. Point to Point check of the existing controls cables. 3. Download the new software into the new controller. 4. Re commission of the BMS controls. 5. Set up IQView4 on panel. 6. To commission, handover and provide documentation relating to the completed installation.
Award information
Awarded date
26 July 2021
Contract start date
26 July 2021
Contract end date
2 August 2021
Total value of contract
£25,543
This contract was awarded to 1 supplier.
Building ManagementSolutions Integrators Ltd
Address
26 Sir Alfred Owen Way, Caerphilly CF83 3HU
Reference
No reference - other
Supplier is SME?
No
Supplier is VCSE?
No
About the buyer
Address
Spring Place
Southampton
SO15 1EG
England
Telephone
+0000
Share this notice
Closing: 25 July 2021, 11am