Published date: 26 October 2021
Withdrawn opportunity - This means that the contract has been withdrawn early. This could be due to a change of circumstances.
Contract summary
Industry
Boiler installations - 42160000
Location of contract
England
Value of contract
£50,000
Procurement reference
NTWNHS001-DN578367-72583407
Published date
26 October 2021
Closing date
5 November 2021
Closing time
12pm
Contract start date
30 November 2021
Contract end date
31 March 2022
Contract type
Works
Procedure type
Open procedure
Any interested supplier may submit a tender in response to an opportunity notice.
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
Monkwearmouth Hospital was built in 1932 and supports a range of mental health services for the local and wider communities. To ensure the site can continue to support the delivery of our services, a programme of essential work has been identified to replace the existing below ground heating pipework with a new above ground system within the following areas;
• Building 3 First Floor
• Building 4 Ground Floor.
All existing radiators are to be picked up in each building listed above.
Costs are to include the tie in to the existing system located in the first floor plant room or ground floor corridor.
All costs are to include the following;
• Design for all systems to complying with the relevant British Standard & ACOP.
• Supply and installation of all pipework and sundries.
• Commissioning.
• Handover Pack (Including O&M Manual and As Fitted Drawings)
To obtain tender documents please express interest via our tender portal via the link provided in this advert.
More information
Previous notice about this procurement
Boiler Installation at Monkwearmouth Hospital
- Opportunity
- Published 26 October 2021
About the buyer
Contact name
Thomas Padgett
Address
Hopewood Park
Waterworks Rd, Ryhope
Sunderland
SR2 0NB
England
Website
Share this notice
Closing: 5 November 2021, 12pm