Published date: 10 October 2023

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 24 October 2023, 5pm

Contract summary

Industry

  • Construction work - 45000000

Location of contract

LU4 9UB

Value of contract

£25,000

Procurement reference

M1 DHS J10-13 - Saw Cutting

Published date

10 October 2023

Closing date

24 October 2023

Closing time

5pm

Contract start date

25 October 2023

Contract end date

31 July 2025

Contract type

Works

Procedure type

Competitive procedure with negotiation (above threshold)

Anyone may ask to participate, but only those who are pre-selected will be invited to submit initial tenders and to negotiate.

This procedure can be used for procurements above the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

M1 J10-13 Dynamic Hard Shoulder Upgrade

How to apply:

Please send an email to the below address:
M1J10-11expressionofinterest@balfourbeatty.com

Subcontract will have to hold Construction Line Gold Accreditation to be considered for works.

Must be in or around a 40 mile radius of postcode - LU4 9UB

The above scheme will require:
• Saw cuts of concrete fenders at 9No overbridge locations.
• Longitudinal saw cuts of varying, approximately 6000m at 150mm depth and 8400m at 450mm depth.
The Subcontract Works are to be executed as part of the Main Contract Works set out below;

Project Title
M1 J10-13 Interchange DHS Upgrade
Location
M1 Junction 10-13
Description / Overall Scope of Works
The existing central reserve Vehicle Restraint System (VRS) is being upgraded along the section of motorway from Junction 10 to Junction 13 as part of the Dynamic Hard Shoulder (DHS) safety enhancement scheme.

The barrier upgrade is to be a Rigid Concrete Barrier system that will be slip-formed in-situ or pre-cast. The in-situ barrier will be Davidsons Concrete Barrier (DCB). The Pre-cast barrier will be Deltabloc Barriers. At bifurcation locations either precast Delta bloc DB 80E barriers or precast DB 80AS-E will be used. As part of the central reservation upgrades works - the drainage system where required will also be upgraded - mainly between J11a and J12.
Main Contract Period The contract programme is defined by the following key dates:
The start of works date is 11th September 2023
The open for traffic date is 31st July 2025