Published date: 20 February 2026

Open opportunity - This means that the contract is currently active, and the buying department is looking for potential suppliers to fulfil the contract.


Closing: 6 March 2026, 12pm

Contract summary

Industry

  • Reinforced-concrete work - 45262310

Location of contract

CA10 1XQ

Value of contract

£5,000

Procurement reference

A66 - FRC

Published date

20 February 2026

Closing date

6 March 2026

Closing time

12pm

Contract start date

7 April 2026

Contract end date

20 February 2028

Contract type

Works

Procedure type

Competitive procedure with negotiation (above threshold)

Anyone may ask to participate, but only those who are pre-selected will be invited to submit initial tenders and to negotiate.

This procedure can be used for procurements above the relevant contract value threshold.

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

The package covers, but is not limited to, the following structural components:

Abutments, including bearing shelves, backwalls, and associated retaining elements
Wing walls including reinforcement details, formwork, concrete placement, and tie-ins
Central pier, where applicable, based on design
Placing of pre-cast deck panels, including the stitched slab, diaphragms, upstands and any longitudinal or transverse construction joints
Installation precast parapet plinths and associated edge thickening or upstand requirements
Any additional minor or connecting works required to complete the structure to specification


In addition to the primary structural FRC installation, the package includes full responsibility for all associated temporary works and ancillary requirements, including:

Temporary works design, supply and installation, inclusive of falsework, propping, support systems, working platforms and stability measures
Testing and control activities, including concrete cube testing, slump testing, rebar inspection hold points, and pour records
Curing systems and processes including curing membranes, coverings, and controlled curing regimes
Concrete temperate monitoring, including the provision and management of sensors where required
Access and edge protection systems including surface preparation, treatment, defect rectification (if required) and final concrete finishes
All labour, plant, materials, consumables, and supervision to deliver a fully compliant structure


The contractor will be required to coordinate their works with adjacent section 3b activities and provide all necessary RAMS, ITPs, quality records, and as-built-information to support completion of Centre Parcs overbridge.


How to apply

Follow the instructions given in the description or the more information section.