{
    "uri": "https://www.contractsfinder.service.gov.uk/Published/Notice/releases/1848d445-85b4-4a92-8cfc-e38f7a33c26c.json",
    "publishedDate": "2026-01-19T12:54:19Z",
    "publisher": {
        "name": "Cabinet Office",
        "scheme": "GB-GOR",
        "uid": "D2",
        "uri": "https://www.gov.uk/government/organisations/cabinet-office"
    },
    "version": "1.1",
    "extensions": [
        "https://standard.open-contracting.org/profiles/eu/master/en/extension.json",
        "https://raw.githubusercontent.com/portaledcahn/ocds_tenderDatePublished_extension/master/extension.json",
        "https://raw.githubusercontent.com/open-contracting-extensions/ocds_budget_breakdown_extension/master/extension.json",
        "https://raw.githubusercontent.com/Crown-Commercial-Service/ocds_awards_datePublished_extension/main/extension.json",
        "https://raw.githubusercontent.com/Crown-Commercial-Service/ocds_partyDetails_vcse_extension/main/extension.json",
        "https://raw.githubusercontent.com/Crown-Commercial-Service/ocds_tender_suitability_extension/main/extension.json",
        "https://raw.githubusercontent.com/open-contracting-extensions/ocds_pagination_extension/master/extension.json"
    ],
    "license": "http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "publicationPolicy": "https://www.gov.uk/government/publications/open-contracting",
    "releases": [
        {
            "ocid": "ocds-b5fd17-13e2c69b-79eb-424f-969d-ead6305248bb",
            "id": "1848d445-85b4-4a92-8cfc-e38f7a33c26c-879706",
            "language": "en",
            "date": "2026-01-19T12:54:19Z",
            "tag": [
                "tender"
            ],
            "initiationType": "tender",
            "tender": {
                "id": "RA355744",
                "title": "RA355744 - Firewater Pump Replacement",
                "description": "Please note that this advert is for pre-tender market engagement only. Tender is scheduled to be Published via the Delta eSourcing Platform on the 26th of January 2026.\r\n\r\nPlease email Lewis.atkinson@londonenergyltd.com to declare interest and to be included in the tender invite when it is published. \r\n\r\nA breif description of Scope below. Please find full spec attached. \r\n\r\nWithin the EcoPark, there is a firewater ring main system consisting of:\r\n1)\t2 x Firewater Pumps\r\n2)\t1 x Sprinkler Header with level control (float switch start)\r\n3)\t1 x Fire Water Ring Main (with pressure-controlled start capability)\r\n4)\t40 x Isolation Valves\r\n5)\t18 x Fire Hose Points\r\n6)\t18 x Fire Hose Connections\r\n7)\t20 x Fire Hydrants\r\n8)\t1 x Crossover Pipeline (for pressure compensation - to be decommissioned and replaced with the jockey pump)\r\nThe Eco Park Firewater Pump Project aims to install two new diesel firewater pumps and integrate them with the London Energy DCS system. This will enhance the control, monitoring, and visibility of the fire protection system compared to the currently installed setup. Additionally, a new jockey pump will replace the existing crossover system to maintain pressure in the Firewater Ring Main.\r\n\r\nIn addition to the installation of two new firewater pumps and a jockey pump, this project requires enhanced visual, audible, and control capabilities. All components and alarms must be integrated with the SCADA system, ensuring seamless monitoring and control\r\n\r\nB)  Project Scope\r\n\r\n1)\tReplace the existing firewater pumps with two new diesel driven firewater pumps. Disconnection of the existing cables from the current firewater pumps and re-termination into the new firewater pump panel. Extending the existing cables via a JB or cable joint. Installation of any additional cables (to be specified and installed by the contractor).\r\n\r\n2)\tSelect, procure and install a new jockey pump to maintain Ring Main pressure. Installation of any additional cables (power and control) for the jockey pump. \r\n\r\n3)\tUpgrade repeater panels to communicate all alarms and faults to the SCADA system.\r\n\r\n4)\tImplement DCS-based control and monitoring of the firewater pumps and jockey pump through SCADA.\r\n5)\tAll technical documentation and drawings are to be provided to LEL by the selected contractor for upload to the London Energy SharePoint, by LEL.\r\n?\r\nC)  Control Specifications\r\n\r\nThis section outlines the existing control and installation configurations, as well as the required upgrades.\r\n\r\nExisting Control and DCS Specifications (Electrical):\r\n\r\n•\tAuto Start: Currently initiated via the \"Firewater Pump Test Panel\" located on the turbine mezzanine level and from the Sprinkler Header Level Switch.\r\n\r\n•\tManual Start: Operated through local control panels at each pump and at various push buttons throughout site. Manual stop is only available via the engine choke on the diesel engine.\r\n\r\n•\tIndications Available:\r\no\tPump running\r\no\tBattery circuit healthy\r\no\tBattery charger healthy\r\no\tPump on demand\r\no\tFail to start\r\no\tLow oil pressure\r\no\tHigh water temperature\r\no\tLamp test\r\no\tAlarm acknowledgement\r\n\r\nAll above indications are repeated on remote repeater panels located in the Turbine Hall (East end).\r\n•\tAudio and visual alarms: Present on both local and remote panels.\r\n•\tNo current control or status indication is available in the CCR via SCADA.\r\n\r\nFault Indication and Alarms (Current Local Control Panel):\r\n\r\no\tHigh water temperature\r\no\tLow oil pressure\r\no\tBattery charger failure\r\no\tBattery circuit failure\r\no\tFail to start\r\no\tPump on demand\r\no\tAlarm acknowledgment\r\no\tRepeater panels provide remote visual and audible alarms.\r\no\tThe local test panel enables auto start/stop of firewater pumps\r\no\tNo current DCS connectivity or SCADA monitoring of pump operation\r\n\r\nFault Indication and Alarms (New Local Control Panel to be installed):\r\n\r\nThe new firewater pump control panel (provided by SPP Pumps) will use a volt-free contact for a common fault alarm. Individual alarm indications will be shown locally via the HMI.  Features include an integrated PCB board with volt-free contacts and designated inputs, dual 10A battery chargers and 12V DC batteries for ignition coil and motor starter.\r\n\r\nAlarm and Status Indications:\r\no\tNot in Auto Mode\r\no\tPump Running\r\no\tPump on Demand (via Float, Pressure or Manual Start request)\r\no\tFailed to Start\r\no\tMains Supply Failure\r\no\tHigh Water Temperature\r\no\tLow Oil Pressure\r\no\tLow Engine Cooling Water Flow\r\no\tLow Fuel Level\r\no\tLow Engine Temperature\r\nD)  New Control Specifications\r\n\r\nThis section outlines the specifications for the new firewater pump control system to be installed by the selected contractor, including all hardwired electrical requirements, the selected contractor is expected to incorporate the existing manual and automatic start functions.\r\n\r\nNew Control System Specifications:\r\n1.\tAuto/Remote Start\r\nAuto or remote start will be initiated from the Firewater Pump Test Panel. Interconnections required to enable this function are shown in the associated project drawings.\r\no\tAll interconnection work will be carried out by the selected contractor.\r\n2.\tManual Start\r\nManual start shall be initiated locally via push buttons installed on the new control panel at each firewater pump. These panels include an integrated HMI display.\r\n3.\tLocal Indication and Fault Display\r\nThe new control system shall provide local indication of the following conditions via LEDs installed on the new repeater panels.\r\no\tPump Running\r\no\tHigh Water Temperature\r\no\tLow Engine Temperature\r\no\tLow Cooling Water Flow\r\no\tRemote Start Active\r\n4.\tRepeater Panel Signal Integration\r\nPre-existing repeater panel cables will be reused. These will be terminated in the new repeater panels, which will display:\r\no\tPump Running\r\no\tFault Alarm\r\no\tNot in Auto Mode\r\no\tPump on Demand\r\no\tMains Failure\r\no\tFailed to Start\r\n\r\nInterconnection between the new firewater pump control panel and repeater panels will be made using an IP67-rated polycarbonate junction box, installed locally at the new firewater pump.\r\no\tAll terminations will be completed by the selected contractor.\r\n\r\n5.\tRepeater Panel Construction\r\nRepeater panels will be built on-site by a LEL-specified technician.\r\no\tAll components must comply with the appropriate SIL (Safety Integrity Level) as defined by selected contractor.\r\n6.\tSWA Cable - Mezzanine Floor\r\nA single 3-core cable, conforming to LPC Technical Bulletins 210 and 236 (TB210 and TB236), shall be routed between the junction box and the relay/start push-button station on the Mezzanine Floor for each firewater pump shall be installed by the contractor.\r\n7.\tSWA Cable - Firewater Pump Control Panel\r\nA single 19-core SWA cable conforming to LPC Technical Bulletins 210 and 236 (TB210 and TB236), shall be routed between the junction box and the control panel on each firewater pump.\r\n8.\tSirens\r\nExisting orange mineral-insulated cables for the sirens on Panel 1 and Panel 2 must be reinstalled on top of the new control panels.\r\n9.\tA LPCB flow meter is to be provided and installed in accordance with LPC rules (technical bulletins) incorporating BSEN12845, with an integral \"self-test\" return loop for both pumps.\r\nExisting Repeater Panel - Indications and Installation (Turbine Hall):\r\nCurrent repeater panels provide the following indications:\r\n1.\tHigh Water Temperature\r\n2.\tLow Oil Pressure\r\n3.\tBattery Charger Failure\r\n4.\tBattery Circuit Failure\r\n5.\tFail to Start\r\n6.\tPump on Demand\r\n7.\tAlarm Acknowledgement\r\n8.\tVisual and audio alarms for remote fault indication\r\n9.\tLocal Test Panel for auto start/stop control\r\nNo DCS or SCADA connectivity for pump status or alarms\r\n\r\nNew Repeater Panel - Indications and Installation (Turbine Hall):\r\n1.\tCommon Fault Alarm - Visual and audible indication\r\n2.\tNot in Auto Mode\r\n3.\tFailed to Start\r\n4.\tPump on Demand\r\n5.\tPump Running\r\n6.\tMains Failure\r\nFull DCS/SCADA Integration - All alarms and remote start/stop functions to be extended to SCADA, existing cabling will be reused for connectivity between new firewater pump control panels and repeater panels, Sirens to be reinstalled on top of new control panels\r\n\r\nE) Jockey Pump Specifications\r\n\r\nThis section outlines the installation requirements for the jockey pump, including electrical, control, and mechanical specifications\r\n1.\tDecommissioning:\r\no\tTwo \"Dust Extraction Pump Discharge\" pumps are to be disconnected, removed, and associated cables made safe.\r\n2.\tInstallation:\r\no\tA Jockey Pump will be installed in place of the \"TY192 Dust Extraction Pump Discharge\" pump.\r\no\tJockey pump to replace cross over pipeline for pressure compensation. Installation to be carried out by the selected contractor.\r\n3.\tElectrical Supply:\r\no\tA new 415V 3-phase supply is required.\r\no\tOne of:\r\n?\t 4-core  Conforming to LPC Technical Bulletins 210 and 236 (TB210 and TB236), , or\r\n?\t3-core  with bare copper earth, Conforming to LPC Technical Bulletins 210 and 236 (TB210 and TB236),\r\nfrom an appropriate designated distribution board. Location to be determined by contractor.\r\no\tA lockable isolator must be installed near the jockey pump on a suitable stand. The appropriate loading and size of the jockey pump motor to be designed, selected, procured, installed and commissioned by the contractor. \r\n\r\n4.\tPump Specification:\r\no\tThe motor nameplate details must be provided to the E&I technician.\r\no\tFinal pump sizing is to be determined by the selected contractor.\r\n\r\n\r\n5.\tStarter Panel:\r\no\tMust be redesigned to include:\r\n?\tControl voltage protection and Primary voltage protection (a number of appropriately rated fuses for the control voltage and a suitable sized MCCB with thermal or CT overload).\r\n?\tMotor protection.\r\no\tDesign and component selection to be carried out by the LEL E&I technician in collaboration with the contractor.\r\no\tDesign documentation and SIL certification to be provided.\r\n6.\tTest Fire Pump Panel:\r\no\tTo be modified by the contractor to incorporate jockey pump activation based on header low pressure.\r\no\tJockey pump to have its own pressure switch independent of the Test Fire Pump Panel, which will need to include a cable from the Jockey Pump Starter Panel to the position of the new Pressure Switch to be selected, designed and installed by the contractor.\r\n7.\t Pump initiation board:\r\no\tA pump initiation board is to supply in accordance with BS EN 12845. Pump initiation boards are designed to allow the initial setting and testing of sprinkler system pump initiation pressure switches in compliance with BS EN 12845. Each main pump has two pressure switches and jockey pumps have a single switch. The pressure switches can be isolated so that its function and cut-in pressure can be verified during system servicing. The special arrangement of ball and check valves means that even if all switches are isolated, a drop in system pressure will still initiate pump operation. As an additional safety measure, lockable ball valves are used to reduce the risk of them being accidentally closed.\r\n8.\tIntegration:\r\no\tThe jockey pump must be fully integrated into the DCS system by the selected contractor.\r\no\tSignals required from the jockey pump to DCS include \"Tripped\" signal in line with other alarm terminology.\r\n\r\n\r\nF) DCS and SCADA Integration\r\nDCS and SCADA Specifications\r\nThe selected contractor is responsible for designing and implementing integration of the fire pump system with the DCS/SCADA system.\r\n\r\n1.\tAll alarms (visual and audible) must be replicated in the SCADA interface.\r\n2.\tFire pump status (running, faults, etc.) must be visible in the CCR SCADA graphic interface, which is to be developed by valmet.\r\n3.\tRemote start/stop and fault status for:\r\n•\tJockey pump and Fire pumps must be available on SCADA (No requirement for a remote \"Start/Stop\" signal from DCS for the jockey pumps).\r\n4.\tAll SIL-rated instruments must be specified and documented by the contractor.\r\n5.\tFire pump header pressure is to be displayed in SCADA, integrated via the graphic interface.\r\n6.\tAll communication cabling must be specified by the contractor.\r\n7.\tAny I/O racks required must be specified and integrated by the contractor .\r\n8.\tPLC panels and I/O racking:\r\n•\tSpecified and installed by the contractor.\r\n•\tAll terminations to be completed by the contractor.\r\n9.\tPLC Logic and Design:\r\n•\tMust be reviewed and approved prior to commissioning\r\n•\tTwo new 12-core cables conforming to LPC Technical Bulletins 210 and 236 (TB210 and TB236), are to be routed via existing cable tray from Alarm Panels 1 and 2 to the \"Central Gauge Board De-Min Control Panel\" in the Turbine Hall.\r\n10.\t Existing spare DCS Valmet I/O slot 8,16 Digital Input Card:\r\n•\tWire numbers 720017 to 720032,are to be utilised for SCADA connections.\r\nG) Contractor Responsibilities - Electrical\r\n1. Decommissioning Work\r\nTo be performed by the selected contractor:\r\n•\tVerifying circuits are de-energised (\"prove dead\")\r\n•\tRemoval of redundant cabling from existing firewater pumps and panels\r\n•\tRemoval of obsolete or unsuitable cable trays, containment systems, and ancillary fixings as required\r\n\r\n2. Installation and Terminations\r\nThe selected contractor will be responsible for the installation and termination of cabling and equipment, including:\r\n•\tInstallation of new repeater panels as per specifications\r\n•\tInstallation of junction boxes at the firewater pump locations to accommodate signal interconnections\r\n•\tInstallation of cable tray systems near firewater pump sets for proper containment and support of cables\r\no\tAll tray work to be galvanised and painted with galvanised spray at cut ends and properly earth bonded.\r\no\tMetal Cable Ties to be applied in all instances\r\n•\tTermination of cables between:\r\no\tNew repeater panels\r\no\tBattery panels\r\no\tNew junction boxes\r\n•\tAll local control panel terminations\r\n•\tInstallation of cable  between the jockey pump and the new junction boxes at the fire pumps to accommodate a \"Tripped\" signal back to the DCS.\r\n•\tEnd-to-end testing of all new and existing circuits and cables to ensure compliance and functionality.\r\n•\tEarthing Design to be submitted as part of the tender submission.\r\n\r\nCable Containment:\r\nThis section outlines the cable containment requirements for the project.\r\n1.\tFor the two cables running from the alarm panels in the Turbine Hall to the junction boxes at the fire pumps, the selected contractor is to:\r\no\tCalculate the appropriate cable tray sizing.\r\no\tAssess and communicate any requirement for scaffolding for installation.\r\n2.\tFor the 240V supply cables from the designated Power Distribution Boards to each fire pump:\r\no\tThe cable trays must be installed suspended due to the inaccessibility and hazards associated with the existing ducting (e.g. lifting metal covers and accumulated sediment).\r\no\tAll installation work to be carried out by the selected contractor.\r\n3.\tFor the cables between the junction boxes and the relay/start push-button stations on the Mezzanine Floor:\r\no\tSuspended cable trays are also required and must be calculated and installed by the contractor.\r\n4.\tAdditional ancillary tray work must be measured and installed for:\r\no\tOther control and power cables (e.g., 35mm² tri-rated cables) routed between the control panel frames and fire pumps.\r\no\tThis work is to be carried out by the selected contractor(s).\r\n\r\nDiesel Day Fuel Tank Control\r\nThis section specifies the fuel tank overfill protection system for the diesel day tanks.\r\n1.\tTo prevent overfilling, the system shall include:\r\no\tA High-High Level Float Switch installed on the existing new tank, and\r\no\tA Solenoid Isolation Valve on the gravity-fed fuel inlet lines.\r\n2.\tThe control philosophy follows a fail-safe design:\r\no\tUpon detection of a high-high fuel level, the float switch signals the solenoid valve to close, preventing overflow.\r\no\tOnce the fuel level drops to a predefined safe level, the float resets, re-energising the solenoid valve to reopen, resuming normal operation allowing the operations to manually fill the Day Tanks.\r\n3.\tThis automatic level regulation:\r\no\tPrevents spillage,\r\no\tEnsures environmental compliance,\r\no\tAligns with critical fuel system safety standards.\r\n4.\tThe high-high level condition shall be annunciated on the control panel.\r\no\tAdditional cables and electrically controlled equipment (solenoids and valves) shall be selected and precured by the contractor.\r\no\tIntegration into DCS to be completed by valmet.\r\n\r\nBattery Control Panels\r\nThis section outlines requirements for the Battery Control Panels associated with each fire pump.\r\n\r\n1.\tTwo Battery Isolation Control Panels are to be mounted to the frames of the fire pump control panels. Additionally, two junction boxes are to be mounted on each fire pump control panel.\r\n2.\tFrom each battery pack, two 35mm² tri-rated cables are to be routed:\r\no\tTo the battery isolation panels,\r\no\tThen to the fire pump terminals for solenoids (for \"Auto\" and \"Manual\" start functions),\r\no\tIncluding earth connections.\r\n3.\tTwo new 240V supplies cables are to be installed:\r\no\tFrom the designated power distribution boards to each fire pump control panel.\r\n4.\tOne cable is to be routed:\r\no\tBetween the junction boxes and the battery isolation panels on each fire pump.\r\nH) Contractor Responsibilities - Mechanical\r\n\r\n     1. Decommissioning Work\r\nTo be performed by the selected contractor:\r\n•\tVerifying stored energy for any pipework removal has been completed by LEL\r\n•\tRemoval of redundant pipework and fittings from existing firewater pumps & making good\r\n•\tRemoval of existing pumps and diesel drivers and any ancillary fittings as required\r\n\r\n     2. Installations\r\nThe selected contractor will be responsible for the installation of the following equipment, including:\r\n•\tInstallation of two new pumps: : SPP TD15A Horizontal Split Case Pump coupled with Matched Diesel Engines and Combined Diesel Tanks.\r\n•\tInstallation of one new Jockey pump and Electric Motor: Discharge Jockey Pump pressure to maintain fire ring main at max 7 bar. Suction pressure will be Plant Auxiliary Cooling Water Pump Suction pressure. Pipework Tie-In's will be site run to existing Firewater Pump suction and discharge pipework local to the pump.\r\n•\tInstallation of new jockey pump valves (Zurich will come in to check required valve spec): \r\no\tx1 Inlet valve\r\no\tx1 Outlet valve\r\no\tx1 Drain valve \r\no\tx1 Vent valve\r\no\tx1 NRV\r\n•\tExisting isolation valves to be used for original fire pump sets.\r\nTimeline for Installations, commissioning and handover (including drawings and training) to be completed by selected contractor.\r\nFirewater Pumps:\r\nThis section outlines the mechanical required works for the firewater pumps.\r\n5.\tDiesel - Supply, isolation standard (Additional valves required), protection, control and instrumentation. Use SPP W00-003E installation specification.\r\no\tUse SPP W00-003E installation specification.\r\n6.\tEngine Exhaust - Contractor to determine whether existing exhaust system is suitable for SPP Diesel Engine specification.\r\n7.\tSuction/Discharge Pipework - Field run into existing firewater pump pipework and compliant with [ASME B31.3.]. ASTM A106/B Sch 40 with fittings and Flanges compliant with existing pipework.\r\n8.\tPipe fittings and supports - Compliant with BS EN 12845\r\n9.\tPainting - Any new pipework to be prepared with x2coats of primer and x2coats of red gloss.\r\n10.\tCivils and structural - Contractor to determine new footprints, ensuring compatibility of existing plinths for gross weights, to accommodate seating of new pumps.\r\nJockey Pumps:\r\nThis section outlines the mechanical required works for the jockey pumps\r\n1.\tSuction/Discharge Pipework - Field run into existing jockey pump pipework and compliant with [ASME B31.3.]. ASTM A106/B Sch 40 with fittings and Flanges compliant with existing pipework.\r\n2.\tCivils and structural - Contractor to determine new footprints, ensuring compatibility of existing plinths for gross weights, to accommodate seating of new pumps.\r\n3.\tPipe fittings and supports - Compliant with BS EN 12845\r\n4.\tPainting - Any new pipework to be prepared with x2coats of primer and x2coats of red gloss\r\n - To access this competition: login to https://suppliers.multiquote.com and view the opportunity RA355744. Not registered on MultiQuote - visit https://suppliers.multiquote.com then register and quote RA355744 as the reason for registration. Any queries please contact MultiQuote on 0151 482 9230.",
                "datePublished": "2026-01-19T12:54:19Z",
                "status": "active",
                "classification": {
                    "scheme": "CPV",
                    "id": "45000000",
                    "description": "Construction work"
                },
                "items": [
                    {
                        "id": "1",
                        "deliveryAddresses": [
                            {
                                "postalCode": "N18 3AG"
                            },
                            {
                                "countryName": "British Oversea Territories"
                            },
                            {
                                "countryName": "Channel Islands"
                            },
                            {
                                "countryName": "Europe"
                            },
                            {
                                "countryName": "Isle of Man"
                            },
                            {
                                "countryName": "Rest of the World"
                            },
                            {
                                "countryName": "United Kingdom"
                            }
                        ]
                    }
                ],
                "procurementMethod": "open",
                "procurementMethodDetails": "Open procedure",
                "tenderPeriod": {
                    "endDate": "2026-01-26T13:00:00Z"
                },
                "contractPeriod": {
                    "startDate": "2026-04-20T00:00:00+01:00",
                    "endDate": "2026-11-30T23:59:59Z"
                },
                "suitability": {
                    "sme": true,
                    "vcse": false
                },
                "mainProcurementCategory": "goods",
                "documents": [
                    {
                        "id": "1",
                        "documentType": "tenderNotice",
                        "description": "Opportunity notice on Contracts Finder",
                        "url": "https://www.contractsfinder.service.gov.uk/Notice/1848d445-85b4-4a92-8cfc-e38f7a33c26c",
                        "datePublished": "2026-01-19T12:54:19Z",
                        "format": "text/html",
                        "language": "en"
                    }
                ]
            },
            "parties": [
                {
                    "id": "GB-CFS-294569",
                    "name": "LondonEnergy Ltd",
                    "identifier": {
                        "legalName": "LondonEnergy Ltd"
                    },
                    "address": {
                        "streetAddress": "EcoPark, Advent Way",
                        "locality": "London",
                        "postalCode": "N18 3AG",
                        "countryName": "England"
                    },
                    "contactPoint": {
                        "name": "Lewis Atkinson",
                        "email": "support@multiquote.com",
                        "telephone": "0151 482 9230"
                    },
                    "details": {
                        "url": "https://suppliers.multiquote.com"
                    },
                    "roles": [
                        "buyer"
                    ]
                }
            ],
            "buyer": {
                "id": "GB-CFS-294569",
                "name": "LondonEnergy Ltd"
            }
        }
    ]
}