Published date: 25 January 2016
Last edited date: 18 November 2016
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Consultative engineering and construction services - 71310000
Engineering design services - 71320000
Engineering-related scientific and technical services - 71350000
Construction consultancy services - 71530000
Analysis services - 71620000
Location of contract
CM9 5DL
Value of contract
£0 to £40,000
Procurement reference
MDC Area Masterplan
Published date
25 January 2016
Closing date
29 February 2016
Contract start date
14 March 2016
Contract end date
7 October 2016
Contract type
Not applicable
Procedure type
Not applicable
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
Yes
Description
The Masterplan is required to align with the Policy S5 requirements and the key projects which are required to reinforce the existing land uses to create jobs and ensure a skilled employment base, attract inward investment, maintain a unique and vibrant High Street, improve connectivity throughout the area to the wider community and take the opportunities presented by the waterfront for regeneration, diversification and cultural attractions for leisure and recreation whilst being resilient to flood risk. With a focus on economic and physical regeneration, the Masterplan will incorporate three sub-areas:
• The Causeway Regeneration Area- a predominantly industrial and large format retail area including a 24 hour Tesco Extra supermarket, Carr's Flour Mills and Bentalls shopping centre. This area also includes Heybridge Centre.
• Maldon Central Area- the historic centre of Maldon and principal focus for commercial activity. It includes a traditional, linear high street with 86 listed buildings
• The Leisure Quarter- the Leisure Quarter provides high quality, open space within the town centre running alongside the Blackwater estuary. It is a regional tourist attraction with walks along the estuary, Promenade Park and Hythe Quay. The area also contains the principal leisure centre in the District and other leisure facilities. The Battle of Maldon site is a short walk from the eastern side of Promenade Park and although of national significance it is largely unrecognised.
The Masterplan should build directly on the guidance contained in the Maldon and Heybridge Central Area Intermediate Study and the Causeway Regeneration Area Development and Improvement Plan. In particular, it should be specific on where new investment should be directed and where the preparation of more detailed guidance will be required.
The appointed consultant will be required to review and build upon the existing evidence base and work undertaken to date in preparing the Strategic Masterplan Framework.
More information
Previous notice about this procurement
- Opportunity
- Published 25 January 2016
Attachments
-
- Maldon and Heybridge Central Area Masterplan.docx
- Invitation to Quote
-
- Address Label.docx
- Address Label
-
- Clarification 1.docx
- Clarification one 26/1/16
About the buyer
Contact name
Paula Jarvis
Address
Maldon District Council
Princes Road
Maldon
CM9 5DL
England
Share this notice
Closing: 29 February 2016