Published date: 25 January 2016

Last edited date: 18 November 2016

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 29 February 2016

Contract summary

Industry

  • Consultative engineering and construction services - 71310000

  • Engineering design services - 71320000

  • Engineering-related scientific and technical services - 71350000

    • Construction consultancy services - 71530000

    • Analysis services - 71620000

Location of contract

CM9 5DL

Value of contract

£0 to £40,000

Procurement reference

MDC Area Masterplan

Published date

25 January 2016

Closing date

29 February 2016

Contract start date

14 March 2016

Contract end date

7 October 2016

Contract type

Not applicable

Procedure type

Not applicable

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

Yes


Description

The Masterplan is required to align with the Policy S5 requirements and the key projects which are required to reinforce the existing land uses to create jobs and ensure a skilled employment base, attract inward investment, maintain a unique and vibrant High Street, improve connectivity throughout the area to the wider community and take the opportunities presented by the waterfront for regeneration, diversification and cultural attractions for leisure and recreation whilst being resilient to flood risk. With a focus on economic and physical regeneration, the Masterplan will incorporate three sub-areas:

• The Causeway Regeneration Area- a predominantly industrial and large format retail area including a 24 hour Tesco Extra supermarket, Carr's Flour Mills and Bentalls shopping centre. This area also includes Heybridge Centre.
• Maldon Central Area- the historic centre of Maldon and principal focus for commercial activity. It includes a traditional, linear high street with 86 listed buildings
• The Leisure Quarter- the Leisure Quarter provides high quality, open space within the town centre running alongside the Blackwater estuary. It is a regional tourist attraction with walks along the estuary, Promenade Park and Hythe Quay. The area also contains the principal leisure centre in the District and other leisure facilities. The Battle of Maldon site is a short walk from the eastern side of Promenade Park and although of national significance it is largely unrecognised.
The Masterplan should build directly on the guidance contained in the Maldon and Heybridge Central Area Intermediate Study and the Causeway Regeneration Area Development and Improvement Plan. In particular, it should be specific on where new investment should be directed and where the preparation of more detailed guidance will be required.
The appointed consultant will be required to review and build upon the existing evidence base and work undertaken to date in preparing the Strategic Masterplan Framework.


More information

Previous notice about this procurement

Maldon District Design Guide

  • Opportunity
  • Published 25 January 2016

Attachments


About the buyer

Contact name

Paula Jarvis

Address

Maldon District Council
Princes Road
Maldon
CM9 5DL
England

Email

paula.jarvis@braintree.gov.uk