Published date: 30 January 2018
Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Contract summary
Industry
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork - 45230000
Location of contract
West Midlands, London, South West
Value of contract
£1,880,000,000
Procurement reference
tender_162031/647703
Published date
30 January 2018
Closing date
21 March 2018
Contract start date
18 December 2019
Contract end date
31 December 2027
Contract type
Works
Procedure type
Negotiated procedure
Contract is suitable for SMEs?
Yes
Contract is suitable for VCSEs?
No
Description
High Speed Two (HS2) Limited ('HS2 Ltd') is the body responsible for developing and promoting the new high speed railway system known as High Speed Two (HS2). HS2 will initially run between London and Birmingham (Phase 1) but will subsequently be extended to link Birmingham to Crewe (Phase 2a) and Crewe to Manchester and the West Midlands to Leeds (Phase 2b). (Phase 2a and 2b are subject to HS2 Ltd achieving Royal Assent). The Railway Systems tranche of work incorporates a number of critical disciplines for the HS2 Project, including without limitation the design, construction, commissioning and testing of track, overhead catenary, lineside M & E & tunnels, power, signalling and communications. This procurement relates to two Lots:
- Lot 1 - Track and Overhead Catenary System (OCS) for a High Speed Railway and
- Lot 2 - Tunnel and Lineside M&E and Tunnel Ventilation for a High Speed Railway.
This procurement is divided into two lots as set out in the remainder of this notice.
About the buyer
Address
High Speed Two (HS2) Ltd, Two Snowhill, Queensway
Birmingham
B4 6GA
England
Share this notice
Closing: 21 March 2018