Published date: 30 January 2018

Closed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.


Closing: 21 March 2018

Contract summary

Industry

  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork - 45230000

Location of contract

West Midlands, London, South West

Value of contract

£1,880,000,000

Procurement reference

tender_162031/647703

Published date

30 January 2018

Closing date

21 March 2018

Contract start date

18 December 2019

Contract end date

31 December 2027

Contract type

Works

Procedure type

Negotiated procedure

Contract is suitable for SMEs?

Yes

Contract is suitable for VCSEs?

No


Description

High Speed Two (HS2) Limited ('HS2 Ltd') is the body responsible for developing and promoting the new high speed railway system known as High Speed Two (HS2). HS2 will initially run between London and Birmingham (Phase 1) but will subsequently be extended to link Birmingham to Crewe (Phase 2a) and Crewe to Manchester and the West Midlands to Leeds (Phase 2b). (Phase 2a and 2b are subject to HS2 Ltd achieving Royal Assent). The Railway Systems tranche of work incorporates a number of critical disciplines for the HS2 Project, including without limitation the design, construction, commissioning and testing of track, overhead catenary, lineside M & E & tunnels, power, signalling and communications. This procurement relates to two Lots:
- Lot 1 - Track and Overhead Catenary System (OCS) for a High Speed Railway and
- Lot 2 - Tunnel and Lineside M&E and Tunnel Ventilation for a High Speed Railway.
This procurement is divided into two lots as set out in the remainder of this notice.